Burbank Build 2015
Yes I hope things go well for us too! So far we've been the "difficult" ones changing plans several times etc.. but our consultant was very understanding. Two weeks to…
Burbank Build 2015
High clay level. Apparently the earth us very damp. They reduced the site cost to 20k. Still high but better then 24k.
Burbank Build 2015
Went to sign our precontracts today. Locked in the Mica 37. Noel our consultant was awesome. We went to the Edge after our meeting with Noel to check out the…
Burbank Build 2015
So we've agreed to build the mica 37. Its a great 5 bedroom house with a 7 star energy rating. Everything is included (-fencing & landscaping), all flooring, blocker blinds,…
Burbank Build 2015
Now looking at the Mica 37 from the Burbank Future range. This seems to be an equally good option for us for far much less $$. Our consultant, Noel, is…
Burbank Build 2015
So our soil test has come back. The honeymoon is officially over. Originally our consultalt told us that our site cost would be no more then 15K. He "assured" us…
Pool & Spa selection in Victoria
We are building too and planning to install a pool once we move in. We have shopped around and opted for a fibre glass pool (8 X 4) with spa…
Burbank Build 2015
Our land settles today!!! Still waiting on Burbanks soil test....
Burbank Build 2015
We are about to build our dream home with Burbank. Our house is the Indigo 51. We are still meeting with the consultant from the display home. His name is…