Switch Homes. WE'RE IN PICS
Looks wonderful! PCI is really a huge step forward, hope everything sorted out in 10 days.
Switch Homes - Doubleview WA
Time for some updates:
Ground floor bricks complete 14/04/2016. So basically it took about 1 months for the brickies to do the ground floor.
Scaffold raised 23/04/2016, and FloorTech installed the next…
Switch Homes. WE'RE IN PICS
Thanks for the advice. I have been following your posts all along, I agree it is best to get everything pictured as it moves along.
Switch Homes. WE'RE IN PICS
Nice progress! Do you have a date for practical completion yet? I am also building with Switch, still ground floor brickwork, they sure aren't fast.
Switch Homes - Doubleview WA
Welcome to the ride, I will be following your posts, too.
Switch Homes - Doubleview WA
Site has been fully loaded on 23/02/2016.
Switch Homes - Doubleview WA
Footings finished on 09/02/2016.
Front
Rear
Switch Homes - Doubleview WA
I have been following a few threads here for so long, and finally I got the time and energy to start a post of my own.
My block is in Doubleview…