HGWA build Burns Beach- 8 months still no slab
Just finished prestart and the nbn pack(minimum 691) includes the nbn ready pack including 1 phone pt, 1 data pt, 1 conduit with chase wire and additional cavity wall on…
HGWA build Burns Beach- 8 months still no slab
Thanks Robina. Will include that on the budget tonight.
HGWA build Burns Beach- 8 months still no slab
Hi Robina good to hear from you. Would you mind if I ask how much is the NBN package as our prestart will be tomorrow?
HGWA build Burns Beach- 8 months still no slab
Thank you guys for the feedback. Just need an advice though if anyone can help? Regarding the led's are we able to replace the 25w with 10w (4x)? The single…
HGWA build Burns Beach- 8 months still no slab
Is final docs after prestart?that is such a long time. We're building in helena valley using amalfi modified to suit the small lot width we got.
At what building stage are…
HGWA build Burns Beach- 8 months still no slab
Do you guys have any idea how long after prestart will slab be poured?
HGWA build Burns Beach- 8 months still no slab
Hi I'm new to this forum but I have read a few posts before. Hope I could join in. Also building with hgwa. Prestart on wednesday so looking for some…