4PostsMost Active Topics
10 years10 yearsPaul1965 posted:
Marking out footings for a pole home on a sloping block
Marking out footings for a pole home on a sloping block
So using a 3m tall pole is the way to go?
10 years10 yearsPaul1965 posted:
Marking out footings for a pole home on a sloping block
Marking out footings for a pole home on a sloping block
Thanks mgilla,
I will look into getting a surveyor.
I think i have the theory down using pythagorus etc and using string lines. But i would need 3 metre high poles…
10 years10 yearsPaul1965 posted:
Marking out footings for a pole home on a sloping block
Marking out footings for a pole home on a sloping block
Hello,
We finally have all approvals in place to begin building our pole home.
The first job is to mark oit the grid for drilling holes for the 30 concrete.footings. pronlem is…
10 years10 yearsPaul1965 posted:
Septic Systems Requirements in WA
Septic Systems Requirements in WA
Is it possible to provide just the type of the septic system you are going to install, in my case, a standard leach system, without nominating a particular plumber up…
Joined homeone
19 March 2014