Am I getting ripped off?
... not at that rate (a predefined one in the contract) and I was able to personally survey the site with the engineer including measuring the depth of all the piers I had so ...
TheBigHouseTheBigHouse
7 Replies19 Jul, 2016 04:54pm
Vienna Q1 build in Capestone, Mango Hill (Plantation Hom
... stage all our site costs were assumed as the land had not yet been accessible for site survey and soil reports to be conducted. This meant our slab was assumed H1 and other site ...