Hi Perry,
I'm in an similiar situation to you with the same building company. They expected me to sign without even seeing the total cost of my extras! The…
I have the site and soil assessment. Is it good or bad?
Hi
I would be allowing 18,000 for site costs with this company and the specifications that you've mentioned.
hope this helps!
I have the site and soil assessment. Is it good or bad?
Hi
I recently got a soil test back from PD also. Turned out they were ripping me off. I had their soil test and my soil test looked at…
What Were Your Site costs? - A Ready Reckoner
Site Classification: HD (Po*ter Davis)
Final Footing Design: Waffle Pod Footing System
House Size: 23.0 Sq
Location: Sunbury
Wall Construction: Brick Veneer, single story, tiled roof
Cut and Fill Requirements: Fill, crushed rock, silt,…
What Were Your Site costs? - A Ready Reckoner
I very nearly signed with Porter Davis Access to build the Paddington, 22sq, single story. The day before going in to sign they informed me that my site costs…