Metricon Vantage 46 - Studio M Upgrades
Hi Scott,
The cost for Hydronic heating I believe depends on the size of the house you're building. Since I'm only building a 38 sq.. the cost is lower. I have…
Metricon Vantage 46 - Studio M Upgrades
I'm also building the Vantage and have my M studio appointment end of Aug. I can let you know some costs I've already got:
Toilet with concealed cistern - around 1750.00
Square…
Newbie-Contour confusion
Hi,
Not sure if I can help but I went through something similar in Melbourne. My block has a fall of 1.5m (across the building platform) front to back and orgiinally…
Concrete Split level Slab costs
Every block (i.e. fall/slope) will be different and require different structural piers and beams to support the structure on challenging building platforms. In my eperience (whether it helps or not)…
Mode Facade Vantage(Metricon) - Hebel
That's great then.. was told by Metricon wasn't possible to attached clothes lines, garden hoses, blinds etc.. cheers
Mode Facade Vantage(Metricon) - Hebel
I'm also planning on building the Vantage with a split level design and have opted for the Hebel option on the Lodge facade. The only thing I was concerned about…
Anyone building with MainVue Homes
Hi All, We have started construction with Mainvue; building the Emporio 432, if you are interested in tracking our progress you can check out our blog at
Anyone building with MainVue Homes
Hi Edb, Yes, it is good to hear that someone else is building with Mainvue too...
The Mainvue electrical contractor contacted us several times directly which is what they said is…
Anyone building with MainVue Homes
Hi all,
We are building with Mainvue, signed the contract this week and building in an established area.
So far, getting to this stage has taken a bit longer than we…