12 d12 dannie88annie88 posted:
When does CCTV cameras get installed

Thanks guys. I might do it after handover since I was told I need to have internet connection for the NVR setup.

12 d12 dannie88annie88 posted:
When does CCTV cameras get installed

Hi. Just a bit unsure about when to install CCTV cameras. I had the pre wiring done and electrical fit out has happened for the rest of the electricals but…

2 months2 monthsannie88annie88 posted:
Electric meter pipe and water tap pipe too close to each oth

Thanks so much. I am using a independent building consultant for each stage. I did ask him he thinks it’s ok. But that was already after bricks were put in.…

2 months2 monthsannie88annie88 posted:
Electric meter pipe and water tap pipe too close to each oth

Hi SaveH2O, Thanks for replying. I did measure it, it looks like it’s about 25mm. Did I understand it correctly? Does it means it’s ok?
Thank you

2 months2 monthsannie88annie88 posted:
Electric meter pipe and water tap pipe too close to each oth

Hi I am not sure if they are too close or not, they have laid the bricks already so I hope it’s okay? Does anyone know the regulation with this?…

5 months5 monthsannie88annie88 posted:
Site costs

I have asked and builder wants to with as per engineer's design so no additional piers. I was told they will slope the earth away from the slab..
Thank you for…

5 months5 monthsannie88annie88 posted:
Site costs

Thanks for the reply Alex.
Here is the compaction report. It looks like it's above 97% if I am reading it right?
*edited

I am not sure where to look for drainage plan…

5 months5 monthsannie88annie88 posted:
Site costs

Hi again. Just bumping the thread..I have been searching all over about this but found limited info. If anyone know of similar scenario please share. Thanks..
I read on the general…

5 months5 monthsannie88annie88 posted:
Site costs

Hi. I have received the engineering report.
The site at the time of testing was found to be filled to form a level pad.
Information relating to the above site was…

  ⋅  1
5 months5 monthsannie88annie88 posted:
Site costs

I didn't get copy of the lab result, I can't see it on the soil test result. It says on result on the basis of the site investigation including bore…

5 months5 monthsannie88annie88 posted:
Site costs

Hi Alex. May I know what you mean by data from the lab? That's all that was given and copy level 1 certificate.

5 months5 monthsannie88annie88 posted:
Site costs

Hi. Thanks to everyone who replied. I will just wait for the final engineering report and update here. So far that's all I know about the piers and edge beam…

  ⋅  1
5 months5 monthsannie88annie88 posted:
Site costs

Hi Chris. Their standard inclusion is quoted up to H1 class. The build cost that was quoted to me includes that. Other thing they flagged prior was that might require…

5 months5 monthsannie88annie88 posted:
Site costs

I have asked them to send me the preliminary report. The builder is firmly stating it will be fixed price contract including site cost. Unless of course I add or…

5 months5 monthsannie88annie88 posted:
Site costs

My plans has been submitted to the engineer and as per what the builder told me engineer has told them what was needed for the build in terms of footings…

5 months5 monthsannie88annie88 posted:
Site costs

Hi Chris. Thanks for replying. I am after a fixed price build and fixed site cost from them. I won’t sign unless it’s fixed price contract. If the engineering report…

5 months5 monthsannie88annie88 posted:
Site costs

Hi Chris. Thanks for replying. I am after a fixed price build and fixed site cost from them. I won’t sign unless it’s fixed price contract. If the engineering report…

5 months5 monthsannie88annie88 posted:
Site costs

Currently I don’t have the engineering report yet. The builder inclusion is quoted up to H1. My soil test is H2 but developer has provided level 1 compaction report. According…

6 months6 monthsannie88annie88 posted:
Land loan and construction loan

I initially had pre approval prior to signing the land contract. It was a general one, as when I applied for pre approval I was undecided with either to buy…

  ⋅  1
6 months6 monthsannie88annie88 posted:
Land loan and construction loan

Hi Bec. Thanks a lot! That clarifies a lot of things for me. I will talk to my broker tomorrow to get a pre-approval for the build. Hopefully it all…

6 months6 monthsannie88annie88 posted:
Land loan and construction loan

Hi Bec. Thanks so much for your reply. Im in Qld. So based on what you mentioned, I can get my broker to apply a pre approval for build loan…

6 months6 monthsannie88annie88 posted:
Land loan and construction loan

Hi. Newbie here. I have signed a land contract this month with finance due 21 days and 14day settlement after. Finance is due next week. I have been told by…

Joined homeone
26 March 2020

Australia's largest home building and renovation
community with over 1.7 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2020

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2020