Shipping Container Engineering
Does anyone know/recommend any engineers that deal with shipping containers in the Brissy/Jimboomba area.
We are trying to put 2 down on my block with a podroof for storage before…
Bitumen Driveway
Do they want asphalt or bitumen, if its the later then I don't see why the spray wouldn't be antiquate, how ever you may not like it (its just a…
Cost estimate for electrical work
There's a lot of variables on what you would get quoted but if you just want a very rough guess.
I would say you would be looking at somewhere in the…
Cost estimate for electrical work
You need to provide more detail, do you have a floor plan, any two way switching required/wanted, how many sockets in the bedrooms do you want, any larger appliances that…
Owner Building Rammed Earth home in Jimboomba
Water Tank got installed today,
Should be getting water tomorrow or monday morning
OB in Logan, Qld. Question regarding Certification
I don't see anything wrong with it to be honest gebtel and don't see how it wouldn't be legal as at the end of the day they are certifying the…
OB in Logan, Qld. Question regarding Certification
Logan dont do their own certification at all, its all private cert. I'm doing my full house + shed on my owner builder permit, certifier was more than happy…
Owner Building Rammed Earth home in Jimboomba
Yeh this one is an aussie designed on from nsw bloke, still haven't had a chance yet to give it a run esp being back at work now. …
Owner Building Rammed Earth home in Jimboomba
Trencher finally arrived today.
forgot to take tools out to cut down the PTO shaft for it though, so no testing yet
With it I can dig out the trenches for power…
Owner Building Rammed Earth home in Jimboomba
Couldn't do that here Stewie, They apparently can get into trouble for taking alcohol or at least that's what a couple of them told us when they were out here
Owner Building Rammed Earth home in Jimboomba
Water Tank Pad almost complete, just need to put in a couple of straight edges and screed level. tank is ordered should be installed in june
We used Bradfords Thermofoil for…
Energy Rating exceptions and flexibility of rules
have you looked into just building a shed of the same size, u can have a shed lined but since its a class 10a building it doesn't require the energy…
Owner Building Rammed Earth home in Jimboomba
Been a while since I've posted anything, unfortunately due to work commitments I haven't been able to get much if anything done.
The positive side is that those same work…
How May lights ?
How many is completely dependent on the area usage and type of lights you want to you.
a standard bedroom for eg, could be 1x batten holder or 1x high output…
Owner Building Rammed Earth home in Jimboomba
, not all the piles are burnt there's one left that they didn't do, however we did originally look into getting the piles chipped but at…
Owner Building Rammed Earth home in Jimboomba
So we had an unexpected call from the Rural Fireries last night to say they were available to burn off a couple of the piles of trees that we asked…
Cost of working drawings, etc in QLD
We've completed this stage in our owner building project. Our house is larger and is rammed earth but general pricing will most likely be similar.
As a basic breakdown
I…
Owner Building Rammed Earth home in Jimboomba
So had a mate come and help by digging out around the shed for a retaining wall.
However he came unstuck when it was time to drill the holes, got down…
Owner Building Rammed Earth home in Jimboomba
Mainly Woodworking stuff, but i want to have a area dedicated to metal work (welding/machine work etc)
Below is a rough pic of what i'd like to eventually have setup
Owner Building Rammed Earth home in Jimboomba
The shed will be my workshop, so doing it all once so it'll be all setup as a nice workshop instead of just a shed with some tools
Owner Building Rammed Earth home in Jimboomba
Last 3 sheets in the middle roof complete, back to work on monday so wont get much more done for a few weeks now.
Owner Building Rammed Earth home in Jimboomba
Got most of the roof lining up today, 3 sheets left on the middle 2 bays, bathroom still to go and that last 2 bays to start
Owner Building Rammed Earth home in Jimboomba
Got most of the insulation in the roof today, more lining tomorrow
Owner Building Rammed Earth home in Jimboomba
Neighbors said we copped a lot, area round the shed is very wet, need to get the retaining wall and drainage setup for it. The main house pad seems…
Owner Building Rammed Earth home in Jimboomba
This is correct, google security has blocked my site for suspicious code on the home page, I reviewed it last night and fixed what they flagged as an issue, reset…
Owner Building Rammed Earth home in Jimboomba
So more Linings pics, Partner has this week off as well so we were able to get into the walls a bit.
More roof tomorrow
Owner Building Rammed Earth home in Jimboomba
Will prob be longer than 4 unfortunately, above is 2.5 days work, but I dont have a long holiday period to get as much done as possible, and work has…
Owner Building Rammed Earth home in Jimboomba
Had a couple of days off so got stuck into the lining side a little.
Owner Building Rammed Earth home in Jimboomba
Got the 1st sheet of plaster up, although stopped after that as I almost broke it doing it solo hehe.
Pre cut most of the insulation needed for the roof, so…
Owner Building Rammed Earth home in Jimboomba
We are going with Quality Tanks although haven't got them in yet as we are still waiting for the firey's to burn the massive pile of trees right where the…