Frame overhanging off the slab, edge slap chip off
We just notice some frame is hanging off the side of the slab, especially on the corner of our garage, and couple edge of the slab have chipped off. …
Building Timeline - Builder won't give one to us
We asked our supervisor if we can obtain some sort of time table or time line since we will be supplying our own web area tiles, laying the cable etc,…
Slab pour today and frame goes up tomorrow? Is this normal
the SS said they do this to all their houses and since they have been building for nearly 30 years...I can't complain in fact we are so happy how fast…
Slab pour today and frame goes up tomorrow? Is this normal
Our slab is getting pour today..yeyeye...but the supervisor told me that they will start the frame tomorrow. I always thought that you need a couple of days for the…
Building Inspector for Brisbane
I've contacted Lee and he is also not doing the Brisbane area..we are in Cleveland.
Anyway one has more references that we can try?
its good the rain finally stopped so we…
Expensive house inspectors VS Cheaper inspectors
I had a quote from a Brisbane inspector, he quoted $1.75 per sqm so for a 300sqm2 house, its about $525 per inspection. are you in Brisbane area?
Question on piers
We will have a lot of piers due to a 'p' class of our block
Should I also get a inspector just to check…
Building Inspector for Brisbane
so far the reply from above links are not so promising...they don't do Brisbane area
Anyway one had good experience with inspector in Brisbane…
Building Inspector for Brisbane
thank you for the link..will get back to ya once we check them out.....our slab will be pour next week...I guess we should get onto a building inspector from now..when…
3 Phase Power?
Our upgrad to 3 phase pow is $2900 !!!!!!!!!!!!!! but this includes meter box upgrade, roof streengening with 4 plaster built ducts.....is it reasonable?
The Surveyors been!!!!
You are going through exactly the same stage as us -we building in Cleveland in Brisbane (Redland City ). Our set back is 5.5m and i was really…
Building Inspector for Brisbane
having been going through the post in regards to building inspector and hearing bad experiences with our neighbour, we are looking for a good building inspector as our slab will…
Construction Delays - Rain Days
We signed our contract and had construction loan approved on 16th March and the contraction started on 30th March (two weeks after our loan approval which was better than we…