Unmanageable soil - Screw Pile
If you have a fixed price for your site cots, then yes I can not see why the builder would like to charge you more for something that is fixed.…
Not a Good Start
In regards to the BAL, even if you are BAL zero you have to build to BAL12.5 as a minimum now.
Henley Monaco Q2 site start
Hello, it takes about 4-5 weeks after your second soil and survey,Admin stage is the worst...
Like you, I was going out of my mind.
Demolish rebuild Monaco Nouveau Q1 Mk 2 with Henley
Hello,
Doing the exact same thing as yourselfs, demo and build with Henley. In regards to the bank, the pre-approval really does not mean much.
You need to consider…
HELP - Gas and Electricity abolishment issues need advice
Hi,
Just been through all the pre demolition work. With the Gas I had to go through the supplier, Energy Australia.... they took the longest. After 2 weeks they…
Questions for people building with Henley?
we got $495 credit back for the dishwasher,
Front tap location
its a LPOD (Legal Point of Discharge), it would be storm water.
Hebel construction feedback
hi, we built with hebel a few years back with M etricon:
Some of the questions we haven't been able to find answers for include:
- Can a clothesline be mounted on…
Underground Power Pit Cost
thanks JB1. Yes most likely forgot to type in a figure!
Underground Power Pit Cost
Hi JB1,
did SpAusnet have on your letter they will supply 6Kw diversified ?
Ceiling Speakers Yamaha or Krix????
Hi guys, I know the post says ceiling speakers, but could you install these Krix on the side walls instead of ceiling?
Would the sound be different then ceiling?
Our Pool Thread....our pool surround now done pics page 3
wow , very cool!
Henley Lexington Lux Q1 in Plumpton / Taylors Hill!
it was pretty easy, all I said to the sales person was can they please provide a driveway at no cost. Told them it was a deal breaker if…
Henley Lexington Lux Q1 in Plumpton / Taylors Hill!
we managed to get 'free' colour concrete driveway from Henley with the current promo. cost is about $3500 (says Henley)
Henley Electrical
interesting, so how will someone know what type of lights they want on the front of the house? Does Henley send out a brochure of possible light selections? …
Henley Electrical
Just a question for the ppl building with Henley, when is the electrical appointment done?
after contract?
Bermuda Pools & Fibreglasspool recs for Melbourne
I reckon the price for the 9m pool for $12.7k is a good price. Recon they can do a deal if we ask for 2?
I'll have mine delivered and just…
Bermuda Pools & Fibreglasspool recs for Melbourne
pls let us know how you go, looking at doing the same thing as owner builder.
Our build with Carter Grange
Hi Tracey,
Yes please on the name of the demolisher, 10k sounds like a good price!.
Henley Emperor 45
Hi, are the 50k site cost just for Henley or does this include the demolishing costs as well?
Our H3NL3Y Lexington Lux Q1 Build - Providence - Greenvale
how much of a deposit had you given them to get to this stage? and are you able to get it back?
Price of Henley flooring
Hi everyone,
I'm wondering what has been the quoted price on flooring options with Henley?
Would be great for budgeting, as we are thinking on going with Henley due to their current…
Building at Hawkstowe
Hello!,
With our bit of land at hawkstowe east, site cost was $22K. and this is with natural land, no fill.. When we were choosing out a block I…
M3tricon Jardine 30 (Frame is up!)
Here is the frame, no frame party this time I'm afraid.
I might go hammer in some extra bits of horizontal studs (if thats…
M3tricon Jardine 30 (Frame is up!)
oh wow!, that was quick. Thanks for dropping by
I'll have to go and have a look this weekend and take some more pics.
…
M3tricon Jardine 30 (Frame is up!)
Wow, we got a slab today!
whos coming over for a slab party?
-kim
M3tricon Jardine 30 (Frame is up!)
wow! Snake (scary name for a next door neighbour btw) .
What stage are you at?
Mr. Doughnuts the bit of land is only is actually…
M3tricon Jardine 30 (Frame is up!)
Hi everyone, not much to report,. Looks like we have some plumbing. waiting on the slab now!