6 years6 yearsvanessah2015vanessah2015 posted:
HGWA Baldivis

Decided to pop down this afternoon to see if the paving had started yet, was pleasantly surprised to see the alfresco had been started, flyscreens were in and they had…

  ⋅  2
6 years6 yearsatembyatemby posted:
NEW BUILD - HGWA SOUTHPORT

Cabinets installed last week and garage floor poured.
Had tile meeting today they said should be finished in a week:)

  ⋅  3
6 years6 yearsnicolac34nicolac34 posted:
Aveling Build - Rosehill Waters

Got a call from our original Aveling sales consultant this afternoon. He’d been out to the house to see the window and confirmed that they’d be moving it ASAP. Said…

  ⋅  3
6 years6 yearsSummitlovinSummitlovin posted:
First Build with Summit Perth WA

Good to know that it can be done and that it has been done well. I *think* my bricks have only been washed once during the build to remove the…

  ⋅  1
6 years6 yearsSummitlovinSummitlovin posted:
First Build with Summit Perth WA

Surprisingly the carpet was done late yesterday arvo! Just a tiny bit of laminate to do then that is the house done in terms of my contract inclusions with Summit.…

  ⋅  1
6 years6 yearsnicolac34nicolac34 posted:
Aveling Build - Rosehill Waters

I went down to site yesterday during the day to check on the tiling progress and see what was happening with the mitred edges (as no one had confirmed).
The tiler…

  ⋅  1
6 years6 yearsJ278J278 posted:
Hilbert HGWA Build

Handover is booked for Friday afternoon hooray!!!

  ⋅  4
6 years6 yearsSummitlovinSummitlovin posted:
First Build with Summit Perth WA

Today was progress day & now i can say I AM EXCITED! Garage in, rangehood installation nearly finished & blinds in. Just waiting on flooring, painting and rangehood to be…

  ⋅  3
6 years6 yearsvanessah2015vanessah2015 posted:
HGWA Baldivis

I Couldn’t resist and has to pop down for a look, it looked like our ceiling insulation had been installed pavers had been delivered our gas cook top was in…

  ⋅  2
6 years6 yearsnicolac34nicolac34 posted:
Aveling Build - Rosehill Waters

Lots has happened this week! Today we went inside for the first time since lock up, painters and tilers were on site which was good to see. We've had the…

  ⋅  2
6 years6 yearsvanessah2015vanessah2015 posted:
HGWA Baldivis

Always good when you have time and not pressured into moving quick. The coordinating of everything when you’re not 100% sure when you will have keys is definitely a challenge…

  ⋅  1
6 years6 yearsSummitlovinSummitlovin posted:
First Build with Summit Perth WA

Snuck in today. Tiling will be finished tomorrow. So happy with the job the tiler has done & in love with my ensuite shower feature wall. Next step electrical &…

6 years6 yearsvanessah2015vanessah2015 posted:
HGWA Baldivis

Had an update yesterday our SS had been away so hadn’t received out ‘Mile Stone email ‘ 😂 garage had been pegged out on Friday, bath was installed either…

  ⋅  4
6 years6 yearsnicolac34nicolac34 posted:
Aveling Build - Rosehill Waters

Thank you!
Did have a walk through this evening, the ceiling and cornices are in and the external render is almost complete. They’ve just got the garage and the back pillars…

  ⋅  1
6 years6 yearsJ278J278 posted:
Hilbert HGWA Build

They’ve started our ensuite tiling but have laid the hexagons in the shower niche as well where as we requested them to only be in the vanity niche. Pretty disappointing…

  ⋅  1
6 years6 yearsSummitlovinSummitlovin posted:
First Build with Summit Perth WA

The ceiling is in :)

  ⋅  1
6 years6 yearsJ278J278 posted:
Hilbert HGWA Build

Tradie left the front door unlocked this evening oops


The tiler has done a fantastic job at lining the tiles up to the stacker door recess. Met him early…

  ⋅  2
6 years6 yearsSummitlovinSummitlovin posted:
First Build with Summit Perth WA

9.5 days and they're basically done! From what i can tell all that is left to do is the pillar for my alfresco. Even with just bricks i am very…

  ⋅  1
6 years6 yearsnicolac34nicolac34 posted:
Aveling Build - Rosehill Waters

This was a nice surprise, slab went down yesterday!!

Aveling Build - Rosehill Waters
  ⋅  1


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024