Coral Boston38 - SEQ
Progress has been steady even through the wet weather which is great. Site supervisor is extremely organised and barely has had a day on site without heaps of action. …

Coral Boston38 - SEQ
Thanks sweetswisssteel , Didn't get any feedback that it was difficult against the fence. The front feature brick is fairly close but the face brick down the actual side is…

Coral Boston38 - SEQ
Scaffolding came down this week. Upper half painted , kitchen and bathroom cabinets started being installed. Can’t wait to see it fitted out inside.

Coral Boston38 - SEQ
It’s been about 10weeks since our site cut. All bricks have been completed, all plaster inside is completed waiting to be finished, scaffolding erected for upper cladding install.
I suspect we…

Coral Boston38 - SEQ
Quick update. K-Spec frame inspection was great. 4 very minor defects picked up that were rectified within a day. Inspector was extremely happy with the job. Plasterers and brick layers…

Coral Boston38 - SEQ
Windows and front door installed today.
All plumbing, electrical and data rough ins complete. Only added 2 PowerPoints directly with the sparky. Prices were exactly the same as doing it through…

Coral Boston38 - SEQ
Quick update. Approaching the frame stage inspection which is booked for the 24/9. Our build has gone great so far, really happy with Sean our site supervisor glad we scored…

Coral Homes general build thread
Hi, currently building the Boston 38. Has anybody used stegbar to provide a basic WIR solution? We have already deleted out the standard shelves and we’re going to go with…

Coral Boston38 - SEQ
From blank slab to this (including frame stage payment claim) in 4 days. Heaps of people working on site each day.

Coral Boston38 - SEQ
Slab down last week, chippy started today. Can’t believe how much they get done in 1 day!
Will try and get some better photos of the frame later in the week…

Coral Boston38 - SEQ
Final some progress. All fencing and retaining walls finished. Underslab foudations and drainage finished this week. Prepping for the slab pour next week. Powerboard in and face bricks delivered.
Still hopeful…

Coral Boston38 - SEQ
House pad cut, fill side retaining wall posts set.

Coral Boston38 - SEQ
Hi there, going ok. Painfully slow from the contract signing stage to the actual start date.
The Brighton facade was 13,990, we originally wanted the balcony facade but I think it…

Coral Boston38 - SEQ
Got the final variation back on Friday and best result ever $0 changes from the pre demolition site tests to the post demolition site tests.
Will have a start date on…

Coral Boston38 - SEQ
Color Variation received back today.
Our colour consultant Mary gave us an estimate on the day that she quickly added up just by knowing the prices in her head. She was…

Coral Boston38 - SEQ
Pool install, Narellan pools serene 9.3 (9m x 3.6m) will be paved etc after house completion.

Coral Boston38 - SEQ
I just looked at the tender and it only ended being an extra 370mm wide to fit an 1800mm wise roller door. It was $1564 for the garage extension +…

Boston 38 | Coral Homes
Just checked our list and it was 49 downlights, and I was a bit out on the $ amount above. We had a $13k allowance , used $11k but had…

Coral Boston38 - SEQ
After about 2 years of looking at display homes, about August 2017 we stumbled across the Coral Boston 38 at Newport Redcliffe. The floor plan was very close to what…

Boston 38 | Coral Homes
I think we ended up around 60. We were originally thinking a fan with lights for bedrooms or a fan with 4 downlights.. ended up fan with 2 lights in…

Boston 38 | Coral Homes
We were very happy with the tile/electrical/color selection. Highly recommend Beaumont over national. They seemed to have a much bigger selection in the standard range. We only spent an extra…

Boston 38 | Coral Homes
Glad I found a Boston 38 thread! We also picked this design after visiting the Newport house. We’re doing a knockdown rebuild in Brighton. Done all our colour and electrical,…