Wrong...We got the same NBN package from PD and that includes underground conduit to the telecom service trench. That's done even before the driveway. Conduit will have a drawstring which…
Porter Davis homes
NBNCo to supply PCD, NTD & FWO after handover
Patch leads not supplied
under grounds not included either
So before you concrete your driveway perimeter of your home, factor in the above.…
Porter Davis homes
NTD is installed by NBN upon request by your ISP. It's free from NBN. PD will only install WSC which will be ready to connect with NBN. Check list of…
Porter Davis homes
we were told it's possible to change. I assume there is no minimum period as we never signed any contract.
Porter Davis homes
We got independent inspector only for frame and PCI.
Porter Davis homes
I don't consider this as a hairline crack. Having a crack in the middle could mean the slab is sinking. Back side of the land was filled due to slight…
Porter Davis homes
A week after handover we can see the window frame joints have started cracking and there is a crack in cornice line as well. This is a major structural issue.…
Porter Davis homes
We are going to get NBN with 25/5 Mbps. I'm thinking of buying a 10/100 base router since I don't get more than 25Mbps. This means I will not need…
Porter Davis homes
we went with NHI and their service isms good. Had the reports sent to us next day morning.
Porter Davis homes
Sorry for spamming, anyone can recommend a place to get fencing done in Berwick?
Porter Davis homes
Congratulations. We built Bermuda with alfresco and took only around 17 weeks.
Porter Davis homes
don't forget to check engineering drawings before cool off period end
and our blind saga is finally resolved!!!
Love the black granite. From where did you buy them and how much is it? I'm thinking what to use for our portico and Alfresco
Porter Davis homes
Here is something interesting to all the readers out there
Most subdivision construction is done by one developer / builder. In order to ensure easy access…
Porter Davis homes
Thanks Fill, my main concern is a scratch in the window frame which they fixed by putting a powder coat over it. Our independent inspector advised it cannot be fixed…
Rawson Homes - Our dream home journey - Metford 28 Trend
Hi there, I have been thinking how practical it is to get all the issues fixed before the handover. There are some issues we identified but haven't been able to…
Celebration Homes - Lennox - All finished - Garden & Lights
Hi there, I have been thinking how practical it is to get all the issues fixed before the handover. There are some issues we identified but haven't been able to…
Building a Waldorf or Marriot by Porter Davis
Hi there, I have been thinking how practical it is to get all the issues fixed before the handover. There are some issues we identified but haven't been able to…
Porter Davis homes
Hi there, I have been thinking how practical it is to get all the issues fixed before the handover. There are some issues we identified but haven't been able to…
Building a Waldorf or Marriot by Porter Davis
Here is a question for all the happy builders who have already done the handover or around the corner Are there any additional documents or…