Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Likes

dulie

Joined 24 May 2016
Gold Member
Followers
2 years2 yearsshokel1975shokel1975 posted:
Building a Metricon Glendale 42 Limited Edition in Melbourne

It has taken a few months…. Mainly due to a 4 month delay in pavers, but the backyard makeover is finally complete. 💦☀️🍻

  ⋅  1
2 years2 yearsBlacktea2sugarsBlacktea2sugars posted:
Thomas Archer Bayside Build

Long overdue updates - sorry
So, you know we baulked at the Thomas Archer joinery in the living room. Just didn't love the options and the cost wasn't fabulous either,…

  ⋅  2
2 years2 yearsSparkyfSparkyf posted:
Building a Doulton in Geelong

We are planning quite a few extra retaining walls everywhere, so we can level everything.

Building a Doulton in Geelong
  ⋅  2
2 years2 yearsksj_007ksj_007 posted:
Metricon Riviera 54

Hi,
I visited a Riviera home that was under construction in Melbourne in January this year (2021). I think it was the 56 sq. version. My sales consultant was good enough…

  ⋅  1
2 years2 yearsr_13r_13 posted:
Looking at Metricon Vantage 48 (H&L)

My experience was that the Metricon pricing is at least internally self-consistent.
We started with a deposit on a Designer range home, but changed our minds to a floorplan from…

  ⋅  1
3 years3 yearsRenmanRenman posted:
KDR Metricon Liberty - Hampshire 45 QLD

Yeah I still pop on now and then.
House is great, nothing really to complain about.
Haven't had any issues I couldn't deal with myself, so no contact with M…

  ⋅  1
3 years3 yearsr_13r_13 posted:
KDR Metricon Liberty - Hampshire 45 QLD

We got this picture on the front of our colour selections summary docusign doc:
viewtopic.php?p=1834174#p1834174
It shows the main render colour, feature render colour, front door, window frames,…

  ⋅  1
3 years3 yearsshokel1975shokel1975 posted:
Building a Metricon Glendale 42 Limited Edition in Melbourne

Special delivery today….

  ⋅  1
3 years3 yearsSparkyfSparkyf posted:
Building a Doulton in Geelong

Not sure yet, will wait and see what it all looks like when finished. Probably some garden at the front and/or side, still looking at options for the other side…

  ⋅  1
3 years3 yearsr_13r_13 posted:
KDR Metricon Liberty - Hampshire 45 QLD

You're most welcome.
It's a manhole to the lower roof space.
Good luck on your journey
Thanks for still being around in the forums! It is most helpful.
How has those two WIR in…

  ⋅  1
3 years3 yearsJTLavsJTLavs posted:
KDR Metricon Liberty - Hampshire 45 QLD

You're most welcome.
It's a manhole to the lower roof space.
Good luck on your journey
Good to see you are still on the forum mate.
How's the house going ? Any issues…

  ⋅  1
3 years3 yearsSparkyfSparkyf posted:
Building a Doulton in Geelong

Getting there! We had our frame completed two weeks ago, wrap done, sand arrived, ready to start bricks next!

  ⋅  1
3 years3 yearsSparkyfSparkyf posted:
Building a Doulton in Geelong

Tiles on today! Finally the floor will dry out, since it's supposed to rain for the next week!

Building a Doulton in Geelong
  ⋅  1
3 years3 yearslilaandcolilaandco posted:
Thomas Archer Hue 42 Bayside Build - 2020/21

hi everyone! thought i would share with you some pictures of our landscaping and a few from around the house. we've had most of our post handover stuff complete now.
We…

  ⋅  3
3 years3 yearsBigDaddyBigDaddy posted:
Thomas Archer Hive 46 (customised) Build 2020-21

Our dining room.

Thomas Archer Hive 46 (customised) Build 2020-21
  ⋅  2
3 years3 yearsSparkyfSparkyf posted:
Building a Doulton in Geelong

A week and a half with no obvious activity, just a few wall boards put up!

Building a Doulton in Geelong
  ⋅  1
3 years3 yearsSparkyfSparkyf posted:
Building a Doulton in Geelong

Meanwhile, in Bell Post Hill:

Building a Doulton in Geelong
  ⋅  2
3 years3 yearsSparkyfSparkyf posted:
Building a Doulton in Geelong

Floor done, walls delivered!

Building a Doulton in Geelong
  ⋅  1
3 years3 yearslilaandcolilaandco posted:
Thomas Archer Hue 42 Bayside Build - 2020/21

Just in time for lockdown 4.0 our new dining table arrived - we designed and commissioned our stonemason Rococo Stoneworks to create this piece of 3 meter magic for us…

Thomas Archer Hue 42 Bayside Build - 2020/21
  ⋅  2
3 years3 yearsSparkyfSparkyf posted:
Building a Doulton in Geelong

Floor joists done, moving onto doing the floor next (weather permitting, forecast showers & windy)!

Building a Doulton in Geelong
  ⋅  1


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024