UrbanEdge Exceed 49 Inclusions ~
We are building with UE and I agree the edge series inclusions are worth the money
New Homes in Eynesbury...... West Melbourne
Uber Urban,
We are building with UE in Eynesbury.
Poll - Initial Deposit to Construction - How long?
Building with Urban Edge
Deposit - 7/2
Contract - 25/3
Colour Selection - 3/4
Site Cut - 22/4
Colour selection was done after contract signing, but this is not their usual process. The normal process…
The placement of the toilet.... modern design fault??
We have a large entertaining area and the toilet is located next to the bathroom in the minor bedroom area. If I could turn back time we would have included…
Eynesbury Township, West Melbourne
Uber Urban,
Congratultions
Hope it all goes well.
We are building with UE in Eynesbury as well, and so far they have been great.
Paul's 'Studio Four.2' - Roof Is On - 26/07
Looking good Paul. I don't mind the brick colour either.
Geez, they did a job on that window frame!!
Ludo 02 with Urbanedge
Raeking,
We had sarking installed with our colourbond roof. It was not specified in the contract so it was a pleasant surprise to see it. I am sure it is usually…
Looking forward to the most?
Looking forward to in order.
1. Space - Going from 15sq to 34sq
2. Alfresco
3. Thaetre Room
4. Kids retreat
5. Two showers!!
Things I regret not having - or having in the contract
Corner Bi Fold door to the Alfresco
25 degree roof pitch
Porcelain tiles to living areas
Dimmer switches to Theatre room and master bedroom.
Paul's 'Studio Four.2' - Roof Is On - 26/07
Looking good Paul,
In my wikdest dreams, I would have never thought I would grt excited over a slab of concrete........It all changed when they sent a invoice for it …
BJ's Regent23 - My DIY Landscaping! *** New Pics!! 20/01
beejay,
I agree with lisanne. I would be pressing to get a boral rep out to the site quickly. The bricks should not be flaking like that.
I wish you…
Question about building close to easement!!
Hi Mishti,
We have a flat 33m length block with a rear 2 mt easement. Our block is flat and the rear slab finishes 3.2mt from the rear boundry. We have…
Ludo 02 with Urbanedge
Hi Chickaroo,
Our contract included all specs and allowances as included in the tender.
Good luck with the build. Urbanedge have been great so far, and they do move with speed when…
Building an Urbanedge Larne 002 - almost finished pics
Hi Fd,
The design is the Eysnebury link on their website. The main living areas are a bit different and has a retreat in the minor room area. Happy about the…
Building an Urbanedge Larne 002 - almost finished pics
FD the house looks great. We are building with UE as well. They scraped the site a couple of days ago. I will start our thread soon. I hope…
Buying Land
Hi ejb,
The fees are payed to the owners association. They are paid quarterly and of the top of my head are around $1400 a year.
We bought land from the builder…
Help needed with choosing external colours!!
Hi Danielle,
We matched our facade render to fascia colours with the feature pillars the same as the roof, and then went with surfmist with the garage door.
Our Colours are:
Brick -…
Buying Land
ejb,
We are about to start building at Eynesbury. As joles said in her post, you need to be aware that depending on the type of block you buy, you need…
post Easter valuations
Guys,
Our disputed valuation came back today and they did not budge. 34K under
The major reason being comparable sales for the…
post Easter valuations
Congrats fully
We are still waiting..... Spoke to our BM at the Bendigo today and said we will have the second eval back Wednesday.…
post Easter valuations
Hi Aimes,
Yeah same bank, but hopefully this time they can organise to give the valuer all the contract . They left out…
post Easter valuations
Guys,
Our valuation "take two" is due back tomorrow! Hope the bank can come back with something closer to the mark (34K under at the moment
CBA valuation on land came in 5k short
Zerosignal,
So sorry to hear you had to pull out. The experience will, as sour as it is, give you the knowledge and confidence in the future.
Thorney & Jaytyn all…
CBA valuation on land came in 5k short
Guys,
My Pain yesterday:
Bank Manager Rings
Land Valuation.........no problem, on the money.
Construction loan - Sorry has come in a lazy $37k short. $253k on a…
Program to see design
Guys,
I found the following sites handy, well maybe not me (The better half)
http://www.colorbondcolours.com/go/home ... visualiser
The colourbond site has a great visualiser where you can pick different…
Eynesbury Township, West Melbourne
Hi Arabella/Donuts,
We are in stage two and are most likely to go with one of the Larne designs with a few mods from Urbanedge. The initial costs seemed high but…
Eynesbury Township, West Melbourne
Hi,
This is my first post, and would like to say the information that I have found from the forum so far has been fantastic and has answered heaps of questions…