Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Izee
19 Posts
Junior Member

Follow
19PostsMost Active Topics

Izee

Joined 12 March 2017
Junior Member
17 d17 dIzeeIzee posted:
Masterton Homes - The next thread 4.0

Question.
We just did our flooring appointment with M. We picked the Prime Luxury Laminate flooring over the standard bamboo but it was a 10k quote. Does M provide a credit…

1 month1 monthIzeeIzee posted:
Masterton Homes - The next thread 4.0

It really does just depend who the SS is I guess... :(
How much does M charge for an extra double powerpoint or for the outdoor waterproof…

1 month1 monthIzeeIzee posted:
Masterton Homes - The next thread 4.0

How long does it usually take from Post Contract to Construction? We've just signed and are in our 90 day post contract period but these 90 days run over the…

5 months5 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

First one is cooler and the second has a warmer feel to it! :)
I like the second one.
We've decided to go with the Espresso Brick in…

5 months5 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

Do you have a closer picture of what the bricks look like? I think we might do the same - PGH Stone with Flush Off White! Save a little money…

5 months5 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

Love those kitchen cupboards MartinsHarmony!
Whew thanks. Our sales consultant said they prefer to add provisions on top so that the tender can be closer to the final contract price once…

6 months6 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

Does the YES inclusions bamboo flooring include the upstairs? Our tender has a provision for $15,000 for bamboo floorboards to the first floor - what flooring is included for a…

6 months6 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

Are those tiles in your bathroom part of the standard mansion pack/YES inclusion selection or did you need to upgrade? We've put in all these provisional allowances for tile upgrades…

6 months6 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

Ooo love that laundry door!
Located in the Inner West Sydney. Will get a quote from the above and see what's included - thanks.

6 months6 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

Thanks! Just wanted to check :)
PS. Anyone have recommendations for site demolition? We've gone over a few and just want to try get a few more…

6 months6 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

We're up to the tender process now and there is this note in the contract:
"Rectification of any damage to the existing driveway, Council footpath and Kerb caused by construction machinery…

7 months7 monthsIzeeIzee posted:
Shower Screen Options

What are the dimensions of that shower space @Our Build123?
We're trying to fit a fixed panel with no door to our place too. The shower space is 1100 x 1100…

7 months7 monthsIzeeIzee posted:
Cost to render

We're planning on doing rendered features just on the front facade. The builder quoted us $7,000 just for rendered features such as columns and balcony. We're also upgrading bricks for…

7 months7 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

That looks great!
We are doing the same. Mind if I ask how much it cost? And do all blind and shutter companies offer this style?
PS. your view is amazing! Ours…

7 months7 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

We're building the Tempus Elite and are having trouble picking blinds/shutters for the long wrap around window in the master room. It's a fixed window so doesn't open.
We like…

9 months9 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

Thanks for the tips! :) Will just go with the tender first and see. Sounds like we'll need to be a little more realistic with our…

9 months9 monthsIzeeIzee posted:
Masterton Homes - The next thread 4.0

Love this forum! I'm at the VERY early stages of deciding on our KDR but pretty much have our sights on the Villina Elite 37.
In terms of budgeting, should we…

Most Active Topics

Joined homeone
12 March 2017

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on TwitterFollow homeone on Google+
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2017