Who pays for rectification works?
So, we are lodging with Fair Trading to hopefully have the builder get this over the line and delete soil removal costs from invoice. Had PCI conducted last week, it…
Who pays for rectification works?
he can write whatever he likes, the removal of spoil if donr correctly in the first instance would have been covere din your siteworks costs. He effed up and has…
Ground level at handover
During construction and at handover, there must be a minimum 150mm gap below the finished floor level (FFL) and the ground.
There must also be a 1:20 slope over the first…
Ground level at handover
Does anyone have any thoughts on this? I am nearing the completion of my build and have got the same situation. Surely the builder has to remove enough soil so…
Stormwater and tank water pipes
Note that the tank’s overflow pipe between the tank and the LPOD comes under sub surface stormwater pipe regulations.
Also note that the NCC has hierarchy over the Australian Standards when…
Stormwater and tank water pipes
i am sure saveh20 will be along soon, but hopefully is spending time with family and friends today
edit for spelling