2 years2 yearspedro72pedro72 posted:
Who pays for rectification works?

So, we are lodging with Fair Trading to hopefully have the builder get this over the line and delete soil removal costs from invoice. Had PCI conducted last week, it…

  ⋅  1
2 years2 yearsNonameNoname posted:
Who pays for rectification works?

he can write whatever he likes, the removal of spoil if donr correctly in the first instance would have been covere din your siteworks costs. He effed up and has…

  ⋅  1
2 years2 yearsSaveH2OSaveH2O posted:
Ground level at handover

During construction and at handover, there must be a minimum 150mm gap below the finished floor level (FFL) and the ground.
There must also be a 1:20 slope over the first…

  ⋅  1
2 years2 yearspedro72pedro72 posted:
Ground level at handover

Does anyone have any thoughts on this? I am nearing the completion of my build and have got the same situation. Surely the builder has to remove enough soil so…

  ⋅  1
2 years2 yearsSaveH2OSaveH2O posted:
Stormwater and tank water pipes

Note that the tank’s overflow pipe between the tank and the LPOD comes under sub surface stormwater pipe regulations.
Also note that the NCC has hierarchy over the Australian Standards when…

  ⋅  1
2 years2 yearsaussietaaussieta posted:
Stormwater and tank water pipes

i am sure saveh20 will be along soon, but hopefully is spending time with family and friends today
edit for spelling

  ⋅  1


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024