Porter Davis homes

And we'd think with SAP and expensive ERM in place, PD won't make silly mistakes like this.
What's your plan for the wrong cupboards?

9 d9 dKushDKushD posted:
Porter Davis homes

We have the kitchen installed with wrong overhead cupboards today. The colour we selected for overhead is called Avignon Walnut. Instead PD delivered and installed pure white overhead…

13 d13 dKushDKushD posted:
House and land Precinct design

I've informe PD from the beginnig that I will be using an independent inspector at each main stage, namely
pre-pour
Framing
Pre-plaster
Fixing/waterproofing(probably)
Pre-handover.
If you go down that path, forward all construction drawings including engineering…

13 d13 dKushDKushD posted:
House and land Precinct design

Arent these two different roles? Surveyor arranges the permits, check the plans etc. There can be only one surveyor per build. Easier to use builders usual one for this.
Inspector is…

17 d17 dKushDKushD posted:
Porter Davis homes

Yes. That's correct, it is schedule 3 - method 2, which I have signed up for :(https://uploads.tapatalk-cdn.com/20171127/6beff3c1c8327573ca1f824d5517a4f2.jpg</p></div><div class=

18 d18 dKushDKushD posted:
Porter Davis homes

I'm having similar issue with two of my facade windows. Long story short PD delivered a set of windows I did not sign the BV for. Now they have fixed…

18 d18 dKushDKushD posted:
Porter Davis homes

Installed the stairs today, while bricklaying going on outside.

  ⋅  2
18 d18 dKushDKushD posted:
Porter Davis homes

My plastering work about 80% finished but they just started brick laying the first floor. So they do those work in parallel.
According to PD..
" Lock up stage – It looks…

24 d24 dKushDKushD posted:
Average Building time from excavation sign to handover

Since the framing stage, we have more days with no worker onsite.
Three quarter of plastering is done...but I see very slow progress these days.

28 d28 dKushDKushD posted:
Porter Davis homes

Inside beginning to look like a (dirty) house. Cant imagine all these plastering work done in a single day.

  ⋅  2
1 month1 monthKushDKushD posted:
Building with Metricon

Pax comes in 2 depths. 350mm and 580mm. So you can find wardrobe inserts that will fit 380, but as you mentioned it is too shallow.

1 month1 monthKushDKushD posted:
Porter Davis homes

Is that Clipsal Saturn series?

1 month1 monthKushDKushD posted:
Porter Davis homes

Anyone planning to replace standard light switches and plugpoints post handover with something better, like LED illuminated push button ones?

1 month1 monthKushDKushD posted:
Porter Davis homes

Agree. I can buy the wall mount for around 22/= and use these wherever I want.
Personally I prefer dome over the bullet cam.

1 month1 monthKushDKushD posted:
Porter Davis homes

Will let you know once I received the kit.
I'm looking for POE powered doorbell and monitor too. There are few Dahua kits. Will finalize one soon.

1 month1 monthKushDKushD posted:
Porter Davis homes

For those who are looking for security camera systems;
After bit of research I bought this from eBay.
Dahua 8 channel NVR 2108HS-8P-S2 + 2TB HDD + 4x IPC-HDW4431C-A 4MP IP…

1 month1 monthKushDKushD posted:
Porter Davis homes

Bricklaying in progress. They are onsite today.

  ⋅  4
1 month1 monthKushDKushD posted:
Porter Davis homes

Internal walls have studs every 60cm and external walls have them every 45cm, I've read. Therefore I'm planning to use the studs to fix the TVs.
However towel rails and…

2 months2 monthsKushDKushD posted:
Porter Davis homes

Wow. That is a bigger issue than the broken temp downpipes. Did PD fix it or accepted to rectify the issues identified?

2 months2 monthsKushDKushD posted:
Porter Davis homes

Useless. They are already damaged.
Any idea at what stage the proper downpipes are installed?

2 months2 monthsKushDKushD posted:
Porter Davis homes

This is how Metricon does the temporary down pipes. (Blue wrap)
This is how we do it down in Porto Daviso

  ⋅  1
2 months2 monthsKushDKushD posted:
Porter Davis homes

Gift wrapped :)

  ⋅  6
2 months2 monthsKushDKushD posted:
Porter Davis homes

We have tiled roof now, few temporary downpipes, and a visitor.
Probably that's where its house was before and I'm the visitor.

  ⋅  2
2 months2 monthsKushDKushD posted:
Building with Metricon

So far I'm happy with content of the report, the explanations given and the email follow ups.
At this rate I will continue to use them for pre-plaster, fixing and pre-handover…

2 months2 monthsKushDKushD posted:
Building with Metricon

I use "New Home Inspections".
Only completed slab pre-pour check and framing. I'm happy with their service.

2 months2 monthsKushDKushD posted:
Porter Davis homes

Received the invoice for frame stage completion. PD doesn't waste time in that department :)
New Home Inspection is booked to go through it tomorrow. Hopefully not…

  ⋅  2
3 months3 monthsKushDKushD posted:
Porter Davis homes

Framing stage going well so far.

  ⋅  3
3 months3 monthsKushDKushD posted:
Porter Davis homes

South East, Officer

3 months3 monthsKushDKushD posted:
Porter Davis homes

Weather permitting, slab could be there by middle of next week. Mine took only three days to frame the slab and pour the concrete.

  ⋅  1

Most Active Topics

More
Joined homeone
5 February 2017

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on TwitterFollow homeone on Google+
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2017