Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Likes
l_vanslyke
73 Posts
Loyal Member

Follow

l_vanslyke

QLD
Joined 19 March 2019
Loyal Member
Following
Followers
4 years4 yearsDoozer1905Doozer1905 posted:
Take CDC approval to another builder

One of my previous employers who did mostly project homes in county WA took a drafting company and there client to court over copyright infringement. The client had come to…

  ⋅  1
4 years4 yearsStructuralBIMGuyStructuralBIMGuy posted:
Take CDC approval to another builder

BTW, It's not just the 2D drawings/plans/elevations which is subject to copyright, all information is also included,ie the 3D Bim Model, data and quantities, "the whole kit and caboodle"
In my…

  ⋅  1
4 years4 yearsleeroy17leeroy17 posted:
Copyrighted Plans

Thank you l_vanslyk for your feedback on copyright

  ⋅  1
4 years4 yearsStructuralBIMGuyStructuralBIMGuy posted:
$36K site costs for P class soil

Hi home135 Thanks for the soil report
That is a standard blanket report but It doesn't indicate where the extra over costs are?
For that…

  ⋅  2
4 years4 yearsbamorrisbamorris posted:
Bal40 Awning Windows

Hi,
I am currently building a Bal40 house and have a number of awning windows.
We have sourced windows tested and certified to AS1530.8 but understand that the opening portion of the…

  ⋅  1
4 years4 yearsHarweeeeeHarweeeee posted:
Ducted air-con added to tender?! Acoustic report

Hello,
We just received our contract for our build, and due to the acoustic report our block got, 2 rooms will need upgraded window glazing and therefore either air-conditioning or mechanical…

  ⋅  1
4 years4 yearsRomywantsRomywants posted:
Rear Setback for small lot - Brisbane city council

Hi
Need some advice on rear set back for small lot.
I believe brisbane city council setback for small lot code is 6metres to rear.
I want to know if 6m setback is…

  ⋅  1
5 years5 yearssaminaminsaminamin posted:
Bathroom Tiles After Handover

Thanks for the input.
I will ask these questions in my upcoming selection appointment.

  ⋅  1
5 years5 yearssaminaminsaminamin posted:
Bathroom Tiles After Handover

Hi Guys,
My builder is not giving me full hight tilings in the bathrooms. is it something i can do later after the handover or I have to get…

  ⋅  1
5 years5 yearsJokerJoker posted:
H1 slab for H2 class soil

*"E" reactive sites are often called "H2" because once it is an "E" you can't use a waffle.If you constantly call sites "E" you will lose volume builders because they…

  ⋅  2
5 years5 yearsparthiv777parthiv777 posted:
H1 slab for H2 class soil

I have requested them to send me the engineering plans asap.

  ⋅  1
5 years5 yearsZorro6Zorro6 posted:
The dreaded Christmas shutdown

Our builders seemed to stop around the 21st dec and resumed about 24th jan. But that’s what it is,things stop for Christmas holidays and everyone should expect that . If…

  ⋅  1


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024