Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
LevaneT
57 Posts
LevaneT
57 Posts
Loyal Member

Follow
57Posts8LikesMost Active Topics

LevaneT

Joined 5 December 2016
Loyal Member
Followers
5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Parador Classic series, they have it on display at the office ground floor.

KDR - Allcastle Homes Grandworth 45 MK2
5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Flood zone will require raised floor level to 1 in 100 year flood level plus margin and that increase the drop edge beam and brick cost. Site access is also…

5 years5 yearsLevaneTLevaneT posted:
Building With AllCastle Homes

The sales person did tell us the display home included lots of extra additions and gave us the price list of the items to consider, such as the glass balustrade…

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

It's been smooth sailing for us and during the build process I never on site and saw the house until April now. I engaged houespect to do the inspection. I…

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

you have to do it yourself and find your own concreter
, AC won't do it.

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

It is bluestone

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

All they need is to check if the storm water system are in according to the hydraulic design plan.
For normal drainage design plumber should able to certify it.
you also…

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

check with your CDC cert at the last page. It list the OC requirement.
For my case no need to do landscape, need vehicle access only (not necessary concrete)
What hold me…

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Concrete driveway done

Write reply...

KDR - Allcastle Homes Grandworth 45 MK2
  ⋅  1
5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Yes so far no major defects and my PCI have some minor window hindge problems , paint etc..overall has been smooth.
Managed to do landscape under 50k included front fence, 11m…

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

I also upset with the way they handle PCI completion.
They book first walk thro next week .
Electrical appliance and air-cond not done yet. ( They asked me if I prefer…

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

I think it is from boundary to my electrical pole. Charge by AC not just power.
They just send me invoice with that description.
"Long electrical run required from boundary…

5 years5 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

I paid the same to Just power but end up additional electrical run $500 from boundary charge from AC.

6 years6 yearsLevaneTLevaneT posted:
AllCastle Contract sign to commence build

Update progress for reference,

Excavation completed
Apr 10, 18

Piering
Apr 13, 18

Setting slab forn board
May 2, 18

Slab pour completed
May 4, 18

Houspect slab inspection
May 8, 18

External drainage completed
May 16, 18

Stormwater Council inspection
May…

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

yes it was beautiful tile before and now we were told beaumont. I have yet to make appointment but beaumont is doing end of year sales now. I think our…

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Yes from slab to frame and roof truss up. It took only 1 month. Brick will follow very soon.
Much faster than I expected.
Tile supplier is beaumont tiles now

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

I had to engaged a hydraulic engineer for the stormwater design and plumber for the work. May be I had to drain to council pit/easement and I also need council…

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Yes that is steel frame it was by default. I didn't ask for that but seems like it last longer than timber.
I still yet to do the driveway grate. It…

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Hi Ymiao4398
Only 3.5k for plumber including absorption pit that was good price. I believed it also included certification.
I have 3 pits & grate(450x450mm) and 150mm pipe, total length of all…

KDR - Allcastle Homes Grandworth 45 MK2
6 years6 yearsLevaneTLevaneT posted:
Building With AllCastle Homes

It round about 23k with the water tank upgrade together but not including extra piering.

6 years6 yearsLevaneTLevaneT posted:
Building With AllCastle Homes

I also like to share my experiences with ACH so far. It has been smooth.
Slab completed and frame windows delivered. Once they finish a milestone, photo and status will upload…

Building With AllCastle Homes
6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Builder need to ensure inspectors have white card, PI insurance etc before letting them on site
Contract clauses 13.3 allow us to conduct inspection : "owner's agent and officers of lending…

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Regarding inspection I would like to share my experience
I am getting Houspect to do it too but funny after I informed AC.
They said u can only do pre-lining and handover…

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

What happened to me is they found asbestos under bathroom slab which is not covered in the contract clause : "Removal of internal asbestos wall sheeting from bathroom, laundry, kitchen…

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Could u mind tell us yr demo cost end up with. I read somewhere that demo contract under 24k not require something, easy to approval etc... Demo guys…

KDR - Allcastle Homes Grandworth 45 MK2
6 years6 yearsLevaneTLevaneT posted:
AllCastle Contract sign to commence build

My electrical plan to share

6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

I used demo C, 24k + additional asbestos 2.3k and vegetation 550
I was given a receipt for dumping it 578 per ton , how to tell whether ...
They did a…

KDR - Allcastle Homes Grandworth 45 MK2
6 years6 yearsLevaneTLevaneT posted:
KDR - Allcastle Homes Grandworth 45 MK2

Yes I took the private electric pole option after consulting friend in the industry as all future wire/lines can make use of it.
With the pole you don't have a electric…

Most Active Topics

Joined homeone
5 December 2016

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024