Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
mars78
200 Posts
mars78
200 Posts
Bronze Member

Follow
200PostsMost Active Topics

mars78

Joined 2 May 2013
Bronze Member
Following
Followers
10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Mckz your driveway appears very similar to mine and they only used 1 load and credited me 2 loads.

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Yes Upsize. Its a good test during the maintenance period. Ours passed fine and I'm pretty impressed with the drainage as there was no water logging anywhere. Still not impressed…

10 years10 yearsmars78mars78 posted:
Gardener's Ridge, North Kellyville

Loop,
It depends where you are in the estate. If you are on Wilandra I would expect 12.5 since you are within 100 metres of the bush and it is on…

10 years10 yearsmars78mars78 posted:
Gardener's Ridge, North Kellyville

I recall for stage 1 Ross kept the fences up for as long as possible to prevent issues such as illegal soil dumping which has happened in other estates.

10 years10 yearsmars78mars78 posted:
Anyone else building in North Kellyville?

I got connected to NBN 2 weeks ago and the service has been very good. At Gardeners Ridge we are on the Stringer Rd FDH cabinet.
HeathWild, is your neighbours…

10 years10 yearsmars78mars78 posted:
Gardener's Ridge, North Kellyville

Scott, our site was classified as M, however with higher than normal salinity, we needed a reinforced M slab.

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

My sentiments the same Upsize! Relaxing by the pool...we'll be a few weeks away from that. I'm concerned we may have less than 50% of the required soft landscaping, but…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Thanks for the locksmith details Upsize. I actually checked all my locks today and the laundry and external garage deadlocks didn't work! Another issue which needs to be fixed.
One thing…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Congrats Upsize!
With the garage door, I think we can get a locksmith to install a deadlock with the same key. I really think Kurmond should've given us the option to…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Thanks for clarifying Big Mama. I hope we can get a deadlock keyed alike.
Crazy that your plans took ages to get approved but at least you'll start shortly.

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

I think you're expected to finalise within 2 days of the walk through.
The packing is much harder with 3 little ones. But since most our stuff is in boxes…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Hey Upsize,
Exciting that you're getting so close!!
We are moving in next Wednesday. It's all too hectic to really celebrate :)
Maybe after we are in. We delayed…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Upsize,
Yes we finally got our keys on Wednesday. A bit of an anti climax because of a number of outstanding paint issues still. But we just cannot afford to delay…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Hey Upsize. Your driveway is looking great! I assume Reece did yours also. He does a very good job. He'll come back in a week or so to seal it…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Ses, the bench top is polar white. We could've gone with some darker speckles but we're happy with it.
Yes frustrations are a normal part of building. As long as…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Thanks for reminding me Upsize, I think I have an electric bill from memory to pay. We have to foot the bill. It's also common in new estates for neighbouring…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Good progress guys. It seems we are still about 3 weeks away. We completed our PC walk through and picked up a number of things which are being fixed already.

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Our soil test was also not required as my developer provided the soil classification. Only the bore holes were required. Otherwise, as soon as Kurmond have access to the land…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Hills Build, we also got our external laundry door upgraded with a window and built in venetian blinds. This was very expensive, but a very neat option.
I've spoken to Caroma…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Hi Upsize,
Fortunately for us, the Developer already installed the crossover and layback (as we don't have the rolled kerb either). Unfortunately this location was not ideal so I need to…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Manago Tiles offer a couple of different ranges of bamboo flooring now. There are 2 colours (natural and coffee) in the standard range which are not an upgrade. The Verdura…

10 years10 yearsmars78mars78 posted:
Gardener's Ridge, North Kellyville

Not sure. Hadn't really noticed, but now that you mention it, the other Elderton on the corner has progressed much faster. I met the people building that house. They're moving…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Joandandy I don't see how that Sierra is 31sq. Especially since the corridors are so narrow. They have flipped the rear of the house though.

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Upsize. Definitely the doubles take longer to do the internals. But your progress is still very good.

10 years10 yearsmars78mars78 posted:
Gardener's Ridge, North Kellyville

The modernview on Timbarra is already occupied. We will like be in within 4 weeks and we commenced 2 weeks after the modernview. But by Christmas Timbarra Ave will be…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Joandandy I just saw the Facebook pics today of that Spring Farm Sierra. Colour choice are very interesting indeed! Luckily ours seem to have turned out well.
We got our…

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Our upgrade was $1260 for all areas except bedrooms and theatre on the Sierra 34.

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Upsize, your progress pics look good. I'll join you with some of mine.

10 years10 yearsmars78mars78 posted:
Building with Kurmond Homes

Same here. Bamboo flooring in the living areas and carpet in the bedrooms and home theatre. I'm a little nervous about kids and bamboo but I'll take the risk!!

Most Active Topics

More
Joined homeone
2 May 2013

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024