Mirvac, Wantirna - Victoria
satge 1 Ballot on last weekend. sales rep said left 8 blocks. 105,92,95,79,52,21,51 & 24.
Porter Davis homes
PD will not let you to bring your copy of contract till you sign and pay the balance 3% deposit. Remember to bring a cheque if you need the contract…
Our Places Fairhaven 23+ - What we've been up to....
Hi Belial
Have you upgrade your carpet? how much it cost?
Alfresco cost
Ours with Places $6066 for 3800 x 5100mm. You will get around 7K based on m2 rate
Our Places Fairhaven 23+ - What we've been up to....
Hi
i am building with Places. Can i know the cat 1 bricks
Copy of Bank Docs to Builder
My builder (PD) ask me to proof the short fall (Contract amount - approved loan amount). which mean i have to give a copy of my bank acount details.…
OMG!! Heartbroken due to excessive Porter Davis Site Costs!
ask the CSC to give you the breakdown of 35K such as slab upgrade, retaining wall, rock removal, cut/ fill, local government & OH&S requirement, services upgrade, estate covenant requirement…
We have gone solar!!!
How many solar panels? is this for lighting/ power or hot water?
Contractor for Crossover
looking a contractor to demolish existing crossover and construct new crossover and driveway
Category 6 bricks - Porter Davis
we were charged $1300 for cat 2 bricks for 35 sqr house + $1200 for off white mortar
Building with Burbank...
Commencement date depend on the builder. We are building with PD. ours says "commencement means the day which the excavation works for the building work commence on the building site"
FHOG…
My building nightmare.. Before the building starts!
wow... we had similar experience but not complicated like you had. We bought our land on Aug 09 and wanted custom design house so that we can keep rest of…
Has anyone used 1300 Driveways?
Hi Frogger & Rinny
Once you have done, add some pic. I am looking charcoal pave cut or pebble wash
Contractor for Crossover
Hi
I am looking a contractor to demolish existing crossover and construct new crossover and driveway. Building in Berwick, Melbourne.
Can recommend someone
Thanks
Porter Davis homes
Hi All
Procedure of Purchase says
WEEK 9 – 11
Porter Davis Homes lodge plans to obtain Building Permit.
Final construction drawings completed.
Material orders are placed with Suppliers.
Our contract was on 18…
Dreamhome Post Handover - Bricks turning green again!
wow beautiful!!!!!!!!!!!
Dont mind to share the type of timber floor you used....
tks
Porter Davis homes
We are building double storey and supposed to be 30 weeks. They added holidays, variations etc etc... and our contract provided 268 days (38 weeks plus). Sales consultants said they…
Has any one had overlooking issues with their DS backwindows
Building Regulations 2006 - SECT 419
Overlooking
419. Overlooking
(1) A habitable room window or raised open space of a building on an allotment
must not provide a direct line of sight into…
Site cost inclusion breakdown in your base house price
i would say interpretation 1 is not correct. non of the builders will tell you the provision of site cost in the base price.
you will get based on interpretation…
Certificate Occupancy, Inspections, Handover - Confused!!!
What insurance you are talking about? help me with this...
Site cost inclusion breakdown in your base house price
non of them will tell you the breakdown of site cost in the base price. Builder will add extraover cost such as upgrade of class M to another class (depend…
Somerfield Estate Keysborough
[quote
They are telling us October start at this point?? I havent asked them but am curious to know what happens at Christmas time and whether they take 4 weeks off…
Garage bricks
It is not normal. the error in starting point of brick. brickie should check the door frame height before start brick work and adjust with mortar joint thickness or fisrt…
PLATFORM 900mm WIDE TO RHS OF BUILDING.....
Excavation start 900mm away from right hand side boundary to avoid retaining wall. this mean you will get 900mm wide strip along the boundary with existing levels. your house on…
Somerfield Estate Keysborough
Congrats on your land purchase. Can I ask what price range?
CARPET!!!!! How many joins are aloud per room?
The standard width for carpet in Australia is 3.66 metres; however, some styles of carpet can be produced in widths of 4 metres. The reason for this width measurement is…
Simonds Homes Nightmare
Go to BACV if they can't resolve all the issues.
Need 700-800mm fill on my land
flat land and almost level with the road level, no retaining wall. fill 50% of floor area. upgrade to 'H' class slab. PM me. i will give more info