6 years6 yearsmsjdw posted:
My double glazed windows fro China
My double glazed windows fro China
Definitely an interesting thread! What was the outcome with the windows in the end?
6 years6 yearsmsjdw posted:
Construction stage | FRAMING
Construction stage | FRAMING
If you're brining in a contractor' to frame a building I would suggest 4 weeks maximum. Depends on the size of their team.
6 years6 yearsmsjdw posted:
Floor plan
Floor plan
Love the floor plan; it looks great! Do you need two doors to open up into the Alfresco area?
6 years6 yearsmsjdw posted:
Seeking Outdoor Kitchen ideas
Seeking Outdoor Kitchen ideas
It looks super! Some planting pots and color will make it look superb.
6 years6 yearsmsjdw posted:
Cost to have natural gas BBQ installed
Cost to have natural gas BBQ installed
Would be looking to spend around $500-$600 cash.
Joined homeone
5 February 2018