15 years15 yearsorangeorange posted:
Can't get the rest of the quotes

Finally, some have responded to my emails at last.
Some do know how to use email + computers, but I don't think all of them know
T&V, thanks for your…

15 years15 yearsorangeorange posted:
Can't get the rest of the quotes

I will keep trying though, I don't want to give up just yet.
I am thinking, maybe they are waiting out for the owner builder to fail with getting the quotes…

15 years15 yearsorangeorange posted:
Can't get the rest of the quotes

Hi, I have been having difficulty getting my quotes finished off. There are only 4 left. So far, I am happy with the quotes I have and I…

15 years15 yearsorangeorange posted:
Which part of this quote is the plumber pre slab work?

I received this quote from the plumber.
DRAINAGE & STACK WORK.
Installation of all drainage required for main bathroom, laundry and kitchen sink on ground floor.
Installation of all…

15 years15 yearsorangeorange posted:
Free Owner Builder Guides + Free Estimates Software

I thought this guide would be a good addition to the existing guides an owner builder may have.
Its free:
http://www.builders-directory.com.au/bu ... cess.shtml
I found the above info…

15 years15 yearsorangeorange posted:
ADSL Wall mount plates, filters + splitters + phone lines

I have read up on this subject, I know a little, but I am not sure about a few things.
The sockets for the Wall Mounted Plate:
RJ45 - ADSL
RJ11 - Telephone
RJ12…

15 years15 yearsorangeorange posted:
Electrician told me to choose the power points, light switch

Yes, I get what you mean. Some rooms would have to have more power points than others. A good example is the TV room (dvd player, tv, speakers,…

15 years15 yearsorangeorange posted:
Electrician told me to choose the power points, light switch

O.K. thanks. I thought it was the electricians job to choose the correct spots for placement + how many. I sort of knew that I would have…

15 years15 yearsorangeorange posted:
Electrician told me to choose the power points, light switch

I asked an electrician for a quote. There was no power points or light fittings or light switch points on the architect home plan.
Neither was there any specific details…

15 years15 yearsorangeorange posted:
Plumber, Drainer, Gasfitter, Roofer - All in one?

Yes, thanks for you response, I too thought it was a good idea, but wasn't sure.
I think it is a good idea because:
Workflow would run more smoothly from…

15 years15 yearsorangeorange posted:
Plumber, Drainer, Gasfitter, Roofer - All in one?

I was driving past a home at Matraville and the owner builder had this sign on their fence.
www .doctor plumbing. com. au
Plumber, Drainer, Gasfitter, Roofer
He also provides Roofing & Gutter…

15 years15 yearsorangeorange posted:
Slab - (Top & Ground) Concreter says they can do everyth

O.K. thanks. Good points.

15 years15 yearsorangeorange posted:
Slab - (Top & Ground) Concreter says they can do everyth

I am getting a quote for the concrete slab. I have found out what is needed. Formwork, placing, finishing, steel mesh reinforcement, vapour barrier, concrete, concrete pumping.
At first,…

15 years15 yearsorangeorange posted:
Carpenter or product seller to install?

Yes, thankyou for your response, very helpful. I will listen to my mother's suggestions more often now. I will take your advice and only get the carpenter…

15 years15 yearsorangeorange posted:
Carpenter or product seller to install?

I recently discussed with my mother about who would be installing the timber floor, external / internal doors, kitchen etc.
I told her that the carpenter can do that. The…

16 years16 yearsorangeorange posted:
How do I get the subbies to give out complete quotes?

By "request" do you mean the contract?

16 years16 yearsorangeorange posted:
How do I get the subbies to give out complete quotes?

Hi, as I look at my quotes given to me by various subbies, they leave things out. Structural engineer did this. Now I can see that others are…

16 years16 yearsorangeorange posted:
Excavation + demolition together? + Buy supplies from subby?

I understand now. The advertisements they show might not be exactly what you think you are getting, (i.e a single subcontractor doing both - That may, or may not…

16 years16 yearsorangeorange posted:
Excavation + demolition together? + Buy supplies from subby?

Yes, thankyou, I understand now.
So are you saying that a company advertised as doing "excavations + demolitions" together (there are a lot of these around), can't really do…

16 years16 yearsorangeorange posted:
Excavation + demolition together? + Buy supplies from subby?

I don't understand what you mean. If I get the excavation + demolition done together (with the same contractor) he would put a mark up on both parts, …

16 years16 yearsorangeorange posted:
Excavation + demolition together? + Buy supplies from subby?

Demolition done with excavation (same sub-contractor)?
or
Excavation done with concreter (same sub-contractor)?
Which would be better, and the reasons why.
I've noticed that you can get a "concrete pumping service" and "concreter"
Can the…

16 years16 yearsorangeorange posted:
Electricians - Quote - What does it include?

Oh, I get what you mean. "Supply and Install". If it doesn't have the word "supply", the materials are not part of the cost. Sometimes the quotes…

16 years16 yearsorangeorange posted:
Electricians - Quote - What does it include?

I asked a builder for a quote, but decided to owner build instead.
Anyway, he did give me the electricians quote. But from an owner builder's perspective, I can't tell…

16 years16 yearsorangeorange posted:
Electrician - tel + ADSL Connections - Can't explain clearly

I already decided. 6 would be good. Each level to have 3 connections. One in the computer room, one in the tv room (for internet tv with…

16 years16 yearsorangeorange posted:
Electrician - tel + ADSL Connections - Can't explain clearly

I recently went to talk to an electrician about the electrical and phone line connections for my owner builder project.
The thing is, I can't understand what he is talking about.
I…

16 years16 yearsorangeorange posted:
Why is a custom design quoted much more?

Thanks. Very well explained.

16 years16 yearsorangeorange posted:
Structural Engineer causes problems. What can I do?

Anyway, I did as suggested and yes he is registered on the national engineers registration board until June 2009, but I don't know about the quality of his work. …

16 years16 yearsorangeorange posted:
Cost of materials? + Anywhere else to get them from?

1. Is there anywhere else apart from a building supplies warehouse where I can buy building materials?
2. I have heard about wholesale supplies. Where can I…

16 years16 yearsorangeorange posted:
Structural Engineer causes problems. What can I do?

I paid by cash. Today I checked, he is registered because he has an ABN number on his letterhead email. That is a relief. At least now…

16 years16 yearsorangeorange posted:
Structural Engineer causes problems. What can I do?

Ok, thanks for your response. So you say he didn't rip me off as the price is correct, thanks for that advice, but still I don't want him…

More
Joined homeone
2 November 2008

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024