1 month1 monthrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Good guess! Yes, the tiles are larger.
They are 750mm x 750mm to be precise
Corfu gris glazed polished 750mmx750mm NY 16-6321FL

2 months2 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Hi Onggie, is it for termites? And is it temporary or permanent (will they remove it after construction or do they bury it in the ground as a permanent feature)?

2 months2 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Today we saw this pipe (with pink covering) going all around the house. Does anyone know why this is installed?

  ⋅  1
2 months2 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Bedroom 3 walk-in wardrobe

Bedroom 3 En-suite

  ⋅  2
2 months2 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

The main tiles downstairs have been installed (finally).
Plus some fitouts in the toilets and the walk in wardrobe.
But not much progress otherwise. The progress is now really slow so I…

  ⋅  1
4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Thank you, sweetswisssteel :)
Does QLD have the Bordeaux 56 or the Bordeaux 56a? I think they may have the Bordeaux56a, with spiral stairs.
The one we…

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Thank you, Dulie :)

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

That is part of the Bordeaux design, so can't change that.
We have double glazed all the windows. Hopefully that will help.
Plus we will have curtains as well.

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Hi Sweetswisssteel, please see pics below

  ⋅  1
4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Thank you, Stanus. We have 2.7m clearance upstairs.

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

2D Plans

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Bedroom 3 (the 2nd master bedroom upstairs)

Bedroom 3 Ensuite

Bedroom 3 Walk-in wardrobe

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Linen cupboard upstairs
Bedroom 2 and Bedroom 4 upstairs:

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Bedroom 1 (1st Master bedroom upstairs)


Bedroom 1 retreat/study

Bedroom 1 ensuite

  ⋅  1
4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Prayer room (a small room connected to family room upstairs)

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Upstairs family room

Toilet upstairs

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Powder room (downstairs):

Stairs:

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Outdoor room

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Laundry

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Living room

Formal dining

Kitchen

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Sitting room (this will be our formal lounge)

Our Bordeaux 56 Build in Sydney
4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Bedroom 5 (downstairs)


Bedroom 5 Ensuite:

4 months4 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

After a long break, here is finally an update...
The house frame is done, sheeting is done, stairs were installed last month.
Windows were installed installed some time back, but now the…

Our Bordeaux 56 Build in Sydney
7 months7 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Hello Bridgettelynette1!
Part of the delay was due to the pending registration of land. The lots were up for sale even before the subdivision and registration was complete. We had to…

8 months8 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Some update on the progress...
The frame looks more complete now and the roof is on


Rear view:

  ⋅  1
9 months9 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

After a month’s break, we finally have some progress. Metricon have started on the frame!
This was done in the space of one week. There was nothing last week (except lots…

10 months10 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Hi Nguyen, please definitely post about your Bordeaux build! We would love to follow your build journey!!
Ours does not have a spiral staircase, as that is the Bordeaux56A plan rather…

10 months10 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

In Kellyville. Suburb is old, but it is a new area within Kellyville. I think the Hills Shire was going name this new development area as new suburb earlier, but…

10 months10 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

Hi Nguyen, the $892,553 includes all the upgrades that we wanted. The base price was around $640K.
The upgrades we have are still far from what is in the display…

  ⋅  1
10 months10 monthsrajatrajat posted:
Our Bordeaux 56 Build in Sydney

I believe that Metricon will be starting the framing anytime now. Site was full of materials today evening

Most Active Topics

More
Joined homeone
3 September 2017

Australia's largest home building and renovation
community with over 1.7 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2019

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2019