Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Likes
Ramee
104 Posts
Senior Member

Follow

Ramee

Joined 26 December 2018
Senior Member
Followers
4 years4 yearsshokel1975shokel1975 posted:
Building a Metricon Glendale 42 Limited Edition in Melbourne

Been busy since we moved two weeks ago, with fences going up, lots of deliveries of furniture, and our landscaper has been hard at work also. So far he has…

  ⋅  4
Building a Metricon Glendale 42 Limited Edition in Melbourne
  ⋅  5
5 years5 yearsronnronn posted:
Our first home build Sorrento 39 with Carlisle homes

Are the colours on the balcony timber lapping, door and garage the same - they look great and look great with the pillars and house colour scheme

  ⋅  1
5 years5 yearsshokel1975shokel1975 posted:
Building a Metricon Glendale 42 Limited Edition in Melbourne

We had a our PCI appointment today and are really happy with how it went. Even though it took 4.5 hrs, there are only minor issues to fix - mainly…

  ⋅  3
5 years5 yearsdarb74darb74 posted:
Bryan & Petersen Build in Ballarat (VIC)

Hi Ramee, Thanks and yes everything is getting sorted fairly well. We met with our building supervisor yesterday for a while…

  ⋅  1
5 years5 yearsshokel1975shokel1975 posted:
Building a Metricon Glendale 42 Limited Edition in Melbourne

Still waiting to find out when our PCI appointment is going to be (should be in the coming weeks).... but in the meantime this happened 😊

Building a Metricon Glendale 42 Limited Edition in Melbourne
  ⋅  3
5 years5 yearsshokel1975shokel1975 posted:
Building a Metricon Glendale 42 Limited Edition in Melbourne

Thanks Renman.... Yes we were lucky enough to get 6 offers after just 12 days on the market. One knockout offer came in…

  ⋅  3
5 years5 yearsdarb74darb74 posted:
Bryan & Petersen Build in Ballarat (VIC)

VINYL FLOORING FIX
Well after some discussions with the builder, they did agree to pull up the main visible problems areas ('lumpy' bits) and get replacement planks re-laid. It was…

  ⋅  1
5 years5 yearsCarnTheHawksCarnTheHawks posted:
Our first home build Sorrento 39 with Carlisle homes

There is documentation that goes with the guarantee. It's mentioned in there.
Another bit of a hassle is that C wouldn't install appliances or heating cooling commissioning until after…

  ⋅  1
5 years5 yearsCarnTheHawksCarnTheHawks posted:
Our first home build Sorrento 39 with Carlisle homes

Abelflex. It's my biggest pet peeve with concrete paving - when concreters ignore it deliberately or not, then argue its importance or purpose. It's an expansion gap between different components.
The…

  ⋅  1
5 years5 yearsronnronn posted:
Our first home build Sorrento 39 with Carlisle homes

Those lights look awesome!!!
We also have 3x junction box over island bench for lights to be installed after handover - thanks for sharing, I'll check out eBay. I found it…

  ⋅  1
5 years5 yearsronnronn posted:
Our first home build Sorrento 39 with Carlisle homes

Yes Ramee, I'm building with Hebel.
It's the Sherwood facade.
I'll have to do smthg similar too for paving to keep the warranty. There must be a hundred other fine…

  ⋅  1
5 years5 yearsronnronn posted:
Our first home build Sorrento 39 with Carlisle homes

Great to hear your PCI went well and congratulations in advance for the handover.
I wasn't told anything about the concrete paving around the house either, but we were doing it…

  ⋅  1
5 years5 yearsCarnTheHawksCarnTheHawks posted:
Our first home build Sorrento 39 with Carlisle homes

Timeframe I mentioned is on track. That's had its final paint touch ups & clean, ready for PCI. Gas line & meter in.
Guessing it's being sat there until Thursday for…

  ⋅  1
5 years5 yearsronnronn posted:
Our first home build Sorrento 39 with Carlisle homes

Faster is definitely better!
Haven't had too many issues so far but will wait to see the end product.
Hope your PCI goes well and there are no issues.

  ⋅  1
5 years5 yearsronnronn posted:
Our first home build Sorrento 39 with Carlisle homes

Hi Ramee
Congratulations - you're almost there! So the whole build process, from site start date, took just over four months for you?
Ours is now in fix stage as well so…

  ⋅  1
5 years5 yearsshokel1975shokel1975 posted:
Building a Metricon Glendale 42 Limited Edition in Melbourne

Not much to report at the moment. Currently getting under stair storage framed & plastered. Plasterers are fixing areas where walls were bowing too much over studs/wall supports,…

  ⋅  3
5 years5 yearsdarb74darb74 posted:
Bryan & Petersen Build in Ballarat (VIC)

SPLIT SYSTEMS GETTING INSTALLED
We are installing 3 split system reverse cycle air-conditioners as 'owner supplied' items. We are using a company recommended to us by our builder, and they…

  ⋅  1
5 years5 yearsKingTacoKingTaco posted:
Madison 35 by Clarendon Homes - Handover!!

Yesterday we had the electric hot water system removed (sold on gumtree! $$) and solar hot water installed. The concrete company was also there to do all the excavation, as…

  ⋅  1
5 years5 yearsCarnTheHawksCarnTheHawks posted:
Our first home build Sorrento 39 with Carlisle homes

The inside is where the majority of tasks are. C & other volume builders split & arrange the schedule to keep it moving overall. Weather affects the outside, but they…

  ⋅  1


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024