6 years6 yearsbashworthbashworth posted:
Slab showing between front door and porch

I would expect a better finish than that before you reach PCI.
Check out the builder's display home as that is the standard of workmanship they were demonstrating to get you…

  ⋅  1
6 years6 yearslovisalovisa posted:
Slab showing between front door and porch

Ours looks like this after it was done still need paint

Slab showing between front door and porch
6 years6 yearsRyan2007Ryan2007 posted:
How long did your build take, and what time did they quote?

We had 40 weeks and have gone over so far about 8 weeks roughly but not sure what it will be in the end

  ⋅  1
6 years6 yearsMadora DreamerMadora Dreamer posted:
How long did your build take, and what time did they quote?

I’m in Perth and was told 6 months from slab down and throw in Xmas so was expecting to get in around the end of January. My build took…

  ⋅  1
7 years7 yearsbuilding-expertbuilding-expert posted:
Should my plumbing look like this?

The pipes are in the cavity therefore on outside of the stud wall. It is unlikely that any fixing of shelving will go right through stud and puncture a pipe.…

  ⋅  1
7 years7 yearsSaveH2OSaveH2O posted:
Should my plumbing look like this?

They would have to be very low shelves.
It is good to see that the builder has properly graded the site slope away from the slab and also installed temporary downpipes.

  ⋅  1


Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024