Not sure if they tried to cover honeycombing or they jack hammered the edge and then tried to patch it?
Structural.Review wrote:
If the rebate is supporting studs/steel column, I recommend you to get the Engineer check the photo and confirm it can take the load or provide rectification, the rest of honey combing needs to be patched to provide enough cover to reinforcements, again this need to be addressed by the design engineer.
more
If the black post is steel column, you need definitely get the design engineer to review and certify the rectification
posted by Ozshaz