5 d5 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

Had our tile meeting today. So many questions, I didn’t realise they care about the direction which they lay them in (the little arrow under the tile).
Changed the floating…

6 d6 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

May 14 - Waterproofing done
Tiles start tomorrow

KDR - New Choice Homes Custom design - Perth, WA
  ⋅  1
8 d8 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

Yeah a few things, basically all from the bricklayers, who didn’t read the plans well. We had a bit of a win really, because we ended up with face brick…

8 d8 dthmethme posted:
Individual Design - New Choice Homes

It looks like some form of sinkback, ie the plaster on the joins has shrunk.
Surely they could strip the paint back and re-do the joins with more plaster? I’m…

9 d9 dthmethme posted:
Individual Design - New Choice Homes

Did you notice the ceilings like this earlier or did it take time for them to go like this?
They used distinctive ceilings for ours as well. Just like the…

11 d11 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

It’s gone really quick, which is great, however we’re taking it not fully complete, which probably makes up a bit of time.
We’ve got the following to do after handover:
Aggregate…

  ⋅  1
11 d11 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

May 8/9
Stone final measure done yesterday and they took the undermount sinks to install.
Wet area floors prepared today, bath bricked in and storm water drainage complete. Tiles booked for…

  ⋅  1
12 d12 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

I can't wait to see the stone installed, especially the island bench. We went with the Gold grain Cararra marble look for the island bench, I hope we get a…

13 d13 dthmethme posted:
Our build with Express Two Storey (Ventura) in South West WA

You could always paint it again later if you didn’t like it.

  ⋅  1
13 d13 dthmethme posted:
Our build with Express Two Storey (Ventura) in South West WA

The colours go well with the roof. Once they do the ground floor roof, you’ll have a better idea.

  ⋅  1
13 d13 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

May 7 -Cabinets installed
Tiles delivered yesterday

Cabinets fitted today and plumbing items delivered (sinks, etc)

  ⋅  2
17 d17 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

It’s been great. They’ve been really good to deal with and happy to fix up anything I’ve noticed might be incorrect.
We’re keen to get into it as soon as…

  ⋅  1
17 d17 dthmethme posted:
Bryan & Petersen Build in Regional Victoria

We have quite tall ceilings (34 course which is about 2950) so you don’t really notice it unless you look closely. Probably could have done without now that we’ve done…

17 d17 dthmethme posted:
Bryan & Petersen Build in Regional Victoria

You could do one style in some areas and the cheaper option in others. We did a nicer cornice in our main areas and then the basic Cove cornice in…

17 d17 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

May 3 - Doors and frames base coat
They also did a base coat on the front render (we went with painted sand finish for now, might do texture coat later…

18 d18 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

May 2 - Ceilings painted

  ⋅  1
18 d18 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

Fixing carpenter finished all the shelving and internal doors today.

  ⋅  1
20 d20 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

And we’re locked out!
Front door is in -

Internal shelving started -

Plumber working on draining and bath roughly installed.

  ⋅  2
20 d20 dthmethme posted:
KDR with Ross North - Perth WA

We went through Vinsan, but did get quotes from a few. The prices were all very similar, however some charge extra for disconnection of services and make you organise it…

20 d20 dthmethme posted:
KDR with Ross North - Perth WA

Good looking plan. We had Ross North in our sights as well, however never got a price from them in the end.
I agree that you should get as much as…

20 d20 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

April 29 - White set complete
Looks like we're going to be locked out soon.
White Set plaster complete -

Site cleanup done -
Front door, internal doors and shelving etc delivered -

21 d21 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

Spent a bit of time at Ikea today getting some ideas for our robe fit outs. Their stuff appears much better than the Bunnings option and I think the pricing…

KDR - New Choice Homes Custom design - Perth, WA
24 d24 dthmethme posted:
Our build with Express Two Storey (Ventura) in South West WA

It’s getting there. You’ll have a roof before you know it, and then it will really start looking like a house.

  ⋅  1
24 d24 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

Bit more action today. Getting quite close to lock up. I expect they’ll push to have it done ASAP, as this will trigger the major payment prior to handover (35%).…

  ⋅  1
24 d24 dthmethme posted:
300mm Hilites above openings

You can still have a hilite in a timber frame. I would assume that this refers to a fixed glass panel above both doors.
Looks like this -

300mm Hilites above openings
24 d24 dthmethme posted:
300mm Hilites above openings

I think this is a fixed glass panel.
Are you having aluminium door frames?

25 d25 dthmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

Not much action this week (which I guess is expected with all the holidays). The highlight so far is our new sign.

They've starting to knock out the bricks below the…

25 d25 dthmethme posted:
New home build - Custom Design WA

It should start coming together pretty quickly for you now that that second slab is done. Is your second floor brick or frame? There's a few double's going up near…

1 month1 monththmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

I’ve been surprised that most Saturday’s they’ve been working. Most days they’re there until around 5pm.
I get the feeling they give them pretty tight deadlines because everything has worked…

1 month1 monththmethme posted:
KDR - New Choice Homes Custom design - Perth, WA

It’s ahead of where we thought it would be. I’m surprised they were working today. I get the feeling there’s lots of trades chasing work in Perth at present.
There’s…

More
Joined homeone
5 July 2018

Australia's largest home building and renovation
community with over 1.7 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2019

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2019