10 years10 yearstonyatthepondstonyattheponds posted:
AllCastle homes – Palace Regent 12

Hi Ac,
Palace Regent 12 is a good house design with good upgrades. eg upgraded roof tiles, bricks, tiles etc as opposed to other house design packages eg Grandworth.
Keep…

10 years10 yearstonyatthepondstonyattheponds posted:
Bricklaying during rain

What are the standards / precautions for covering up brickwork during rain? Is it necessary?
We've had rain on and off for the past few weeks. The bricks are being…

10 years10 yearstonyatthepondstonyattheponds posted:
Rain during build.

We've had a couple of wet days in Sydney the past week and during that time the frames and floorboards for 2nd storey have been exposed to wet and dry…

10 years10 yearstonyatthepondstonyattheponds posted:
Broken areas of barrier in pre slab . Is this OK?

Thanks guys...
I actually requested an inspection of the site on Wednesday. The builder emails me on the Thursday arvo saying they completed it already. I have a feeling they…

10 years10 yearstonyatthepondstonyattheponds posted:
Concrete Slab bulging at the bottom

Is this acceptable? When walking around the slab there seems to be lots of bulging at the bottom. What causes this? Did they take the formwork out too quickly?? Will…

Concrete Slab bulging at the bottom
10 years10 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

Quite a bit of progress has been made.
Piers were filled... (I had 96m of piering, 46m over the tender limit - costing me additional approx $5300) but there were two…

10 years10 yearstonyatthepondstonyattheponds posted:
Broken areas of barrier in pre slab . Is this OK?

I think so too. What are problems down the track if the barrier is breached?

10 years10 yearstonyatthepondstonyattheponds posted:
Broken areas of barrier in pre slab . Is this OK?

Is this OK? Acceptable?

Broken areas of barrier in pre slab . Is this OK?
11 years11 yearstonyatthepondstonyattheponds posted:
Half Filled Piers for house foundation. Is this ok??

The concreters came in yesterday, drilled holes for my piers (64!!) and then came late in the afternoon to fill the holes with concrete (obviously). everything has been filled except…

11 years11 yearstonyatthepondstonyattheponds posted:
Is this OK?? half filled piers

The concreters came in yesterday, drilled holes for my piers (64!!) and then came late in the afternoon to fill the holes with concrete (obviously). everything has been filled except…

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

Our port-a-loo arrived yesterday. meaning the building will be starting soon. Will keep you posted on good/bad quality. hoping its all good. since we didn't get a discount (it all…

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

adding extra area is on average $1000/m^2.
bathrooms costs more
alfresco $500/m^2
garage is usually $700^2
But seeing you're at tender stage, Im sure you can bargain on that.
Also we got…

11 years11 yearstonyatthepondstonyattheponds posted:
Dropped Edge Beam

I believe there are four courses. I've attached a picture.
So my aim is to extend the driveway in red the full width (left wall + garage) to the same…

11 years11 yearstonyatthepondstonyattheponds posted:
Dropped Edge Beam

I have a dropped edge beam on the left side of my slab (say RL 51.5). My garage level is higher (RL 52.0). So when I get a concrete driveway…

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

During contract signing:
- I had to point out that their liquidation damages were too low (its like they wait for you to pick it up)
- I was told that minor…

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

Extra Variations:
Vegetation Scrape - $680
Removal of overburden from piers and service trenches - $550 per load
40mm stone in kitchen in lieu of 20mm - $2140 (In the contract they…

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

Iam unhappy at the delay, as I was instructed via Allcastles letter that I required a deposit PLUS a letter of commencement at the day of contract signing.
This wasn't…

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

Construction has not started yet. Although I checked the site today, and they've put four stakes into the ground. 2 stakes on the lower left side of the block which…

11 years11 yearstonyatthepondstonyattheponds posted:
Retro Fit Windows

Whats the best and nicest way of retro fitting standard builders windows (sliding and awning windows) for;
1. Insulation
2. Noise
I don't particularly like a secondary window inside. As you are limited…

11 years11 yearstonyatthepondstonyattheponds posted:
Dimmable Downlights Posthandover + Exterior Lights

1) Can you install a dimmer after handover or do you have to do during wiring? We are thinking of install downlight after handover.
We have sets of 2 downlights and…

11 years11 yearstonyatthepondstonyattheponds posted:
The Ponds - Ridgeline

WOW... land at The Ponds is equivalent to Rouse Hill/North Kellyville now.

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

Standard carpet includes; polyester, nylon and wool. which are around the $30/m^2 range (retail).

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

Yeah we went with easy build package. In hindsight if i had known.. would have went the other route. It was about a 5k refund for both carpet and tiles.

11 years11 yearstonyatthepondstonyattheponds posted:
fridge space

Remember to consider fridge depth as well. Alot of the fridges require 90cm+ depth.
We've opted to leave all our fridge and microwave spaces as standard. And our fridge depth…

11 years11 yearstonyatthepondstonyattheponds posted:
Building the AllCastle Grandworth 42.5+

I would but the refund the builder is giving me back for the tiles and carpet is peanuts compared to the price of doing it all after handover.
My choices are…

11 years11 yearstonyatthepondstonyattheponds posted:
The Ponds - Ridgeline

tender -
deposit -
plan presentation -
external colour choices -
internal selections - (still need to finalise electricals and carpet)
landscape conditionally approved -
have CDC approval - (now waiting for…

Most Active Topics

Joined homeone
11 December 2012

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024