Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Vineet Babbar
43 Posts
Vineet Babbar
43 Posts
Junior Member

Follow
43PostsMost Active Topics

Vineet Babbar

Joined 10 January 2021
Junior Member
1 year1 yearVineet BabbarVineet Babbar posted:
Downpipe in the piers of the front porch

Pulse, Thanks for the message.
However, I'm inclining towards the external downpipes option. Trying to avoid any maintenance hassles in the future.

1 year1 yearVineet BabbarVineet Babbar posted:
Downpipe in the piers of the front porch

Hi Chris,
Glad to hear from you. Hope you are well !!
My Bad, Forgot to mention. The brick work has not been done yet. The plumber is doing in the rough-ins…

1 year1 yearVineet BabbarVineet Babbar posted:
Downpipe in the piers of the front porch

Hi experts,
I would like to get some suggestions here. Please the image of the front façade for the new build that is at the lock-up stage. I want the downpipes…

2 years2 yearsVineet BabbarVineet Babbar posted:
Mould on timber frame

Hi there, Did you have your building surveyor involved into it?

2 years2 yearsVineet BabbarVineet Babbar posted:
Mould on timber frame

@, gpsgrl
Can you please suggest what you did with your mould issue. I've the same issue with my timber frame. Its been…

2 years2 yearsVineet BabbarVineet Babbar posted:
Attic Space - Load Bearing Capacity

StructuralBIMGuy
Just an update, I've spoken to the builder. He said that engineering or roof truss plan can't be updated because the roof…

2 years2 yearsVineet BabbarVineet Babbar posted:
Attic Space - Load Bearing Capacity

Thanks Chris. Will surely let you know the outcome.

2 years2 yearsVineet BabbarVineet Babbar posted:
Attic Space - Load Bearing Capacity

Engineering plan showed the steel member for the roof truss. However, the builder said that he got the approval of not using the beams shown on the engineering plan. Then…

2 years2 yearsVineet BabbarVineet Babbar posted:
Attic Space - Load Bearing Capacity

Thanks guys for getting back to me.
How could we beef up the load capacity on-site? Can that be done by using the double joists or bearers on the attic floor?…

2 years2 yearsVineet BabbarVineet Babbar posted:
Attic Space - Load Bearing Capacity

Hi Folks,
A very technical question - I'm building a new home with an Attic Space 3m X 4.5m and the builder has provided me with the Roof Truss Plan.…

  ⋅  1
2 years2 yearsVineet BabbarVineet Babbar posted:
Slab pour - Electrical and Plumbing questions

Hi guys,
Need suggestions on couple of issues:-
1) There was an electrical conduit that left at the Kitchen island bench, which I believe was laid by the sparky. This has been…

2 years2 yearsVineet BabbarVineet Babbar posted:
Please identify the Fence for me.

Hi guys, I would like the know the fence type and supplier for the fencing shown in the attached image.
If you can help that would be great.

2 years2 yearsVineet BabbarVineet Babbar posted:
WINDOWS & DOORS DELAYS

The construction at my joint has just started and they gonna pour the slab within 2 weeks time. I've had my builder checked the windows supply at the start of…

2 years2 yearsVineet BabbarVineet Babbar posted:
WINDOWS & DOORS DELAYS

Hi guys,
Did anyone experienced any projects delays due to delays in the supply of windows and doors.
My builder is saying that their suppliers will take 4 months to deliver after…

2 years2 yearsVineet BabbarVineet Babbar posted:
Rainwater Tank, VIC

Hi everyone, Can someone please recommend me the size of rainwater tank. I'm building a new home and roof size is 385m2 (colourbond roof) and council design guidelines requires a…

3 years3 yearsVineet BabbarVineet Babbar posted:
Feedback on the Plan

Hi Peeps,
I would like to get a feedback on the attached preliminary plan.
There are mainly 2 concerns I've have on this plan:-
Firstly, the corridor which is 1.3m. I would…

3 years3 yearsVineet BabbarVineet Babbar posted:
Need advice from Draftmans or Roof designers

Hi mate, can you please recommend the modifications required to make it work.

3 years3 yearsVineet BabbarVineet Babbar posted:
Need advice from Draftmans or Roof designers

Hi Guys,
Can the attached floor plan go with facade attached?
The issue I can see with it that we would need to move the front proch to the right hand side…

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Hi oklouise,
Thanks for the update plan. However, it is increasing the total floor area. I'm limited with 34sq. home.
Also, can you…

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

oklouise and chippy - Hey guys, can you please assist !!

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Hi Everyone,
Further to our last conversations, I'm in touch with my draftsman for finalising the concept plan. I've provided him with the following plan. Also, we would like to…

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Hi mate, Definitely, I would like to have the entrances to bedrooms off the hallway and the same way the entrance to the common bathroom. Also, its a good idea…

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

I agree. But don't you think that we will loose the space in the common bathroom by adding an extra hallway. My preference is to have the entrance to the…

  ⋅  1
3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Hi oklouise,
Can you please also send me high-res copy of the plan. The dimension are not clear. Tnx - Vin

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Hi oklouise,
Thanks again for the updated plan.
The block dimensions are 20m X 40m. I think that the front setback is 8.5m. Can you please let me know the house…

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

You also have enormous WIR. Personally I hate having to walk right through the bedroom from the ensuite to the robe to get changed. I'd prefer them adjacent to each…

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Thanks mate, Its a good suggestion, because the we wanted the bedroom 3 and 4 a bit bigger, probably atleast 3.5 x 4. By sequecing the size of the study…

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Hi Chippy,
Thanks for the text. I don't need a big study. We can squeeze the size a lit bit down.
Can you please suggest what you are thinking.

3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Hi All,
Thanks to all of you for the feedbacks. I'm really overwhelmed with all the responses. I'm so glad that this community is so helpful.
A special thanks to Oklouise for…

Needs feedback on the Floor Plan
3 years3 yearsVineet BabbarVineet Babbar posted:
Needs feedback on the Floor Plan

Thanks guys for your reply.
@ and
I agree with you on the door to courtyard from the kitchen (probably a sliding door).
I'm thinking to have add a toilet…

Most Active Topics

More
Joined homeone
10 January 2021

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024