New home (at loggerheads with builder)
thanks so much....we rang the rego board who have told us to write a formal letter of complaint to which they must respond in 10 days. handover is next week…
Hello from Gidgi, Perth
Hi everyone,
We live in Gidgegannup/Toodyay about an hour from Perth. 25acres bush, train carriage (we are fixing up) and halfway through building a stumped cedar home. Pretty small 120sqm but…
Expand the crossover
hi, i'm in wa and we had to bitumenize our crossover due to council regulations. it cost us about $1000 and was a pain (we live rurally so getting 'bluemetal'…
New home (at loggerheads with builder)
thanks everyone!
he is refusing to put straps on roof braces & structure (he says a nail is good enough!), tie down stumps, there are 5mm gaps between doors/external walls, when…
New home (at loggerheads with builder)
Hi everyone,
I'm new and building a stumped home in the hills of Perth. My building supervisor refuses/excuses himself to follow the structural engineering on the house plans (that he wrote!).…
About
Introduction
Hi everyone,
We live in Gidgegannup/Toodyay about an hour from Perth. 25acres bush, train carriage (we are fixing up) and halfway through building a stumped cedar home. Pretty small 120sqm but…
Occupation
teacher
Interests
chillies, rural life