Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Entilzha
710 Posts
Gold Member

Follow
710Posts104LikesMost Active Topics

Entilzha

SA
Joined 12 March 2017
Gold Member
Followers
5 d5 dEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

floors and pendants look nice.

12 d12 dEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

Grats. now the real fun begins
at least you have a few spare garage door openers :)

14 d14 dEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

they will send someone out to check the tiles but advised they get a lot of high moisture levels as a result of the pest company and havent found an…

17 d17 dEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

just had my first pest inspection all good aside from high levels of moisture behind shower walls - but doesnt appear to be in cavity. See how long builder takes…

19 d19 dEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

The front is just about finished now.
think i Just need to add a couple more groundcover plants and hope i dont kill them and get some more of the…

Hickinbotham Torquay Mod - Post Handover
  ⋅  1
24 d24 dEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

my driveway and front path plus crossover (was about 32m2 in total) and was quoted between $2600 and about $3500 from memory

24 d24 dEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

Stormwater fixed - The damaged section was replaced with a flexible pipe so cant be squashed again as easily and is perhaps 2 cm deeper now.
Now almost all set for…

28 d28 dEntilzhaEntilzha posted:
Damaged Stormwater pipes front yard after neighboring Build

thanks for that and i know it will probably be a hassle to chase the other builder. have heard back from the guy who did my pipes and he will…

28 d28 dEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

like that mailbox how much did it cost?

28 d28 dEntilzhaEntilzha posted:
Damaged Stormwater pipes front yard after neighboring Build

Question for those with expereince/ knowledge in this area
I had settlement nearly 7 months ago and the house next door started about 2 months after this and recently completed (4-6…

Damaged Stormwater pipes front yard after neighboring Build
28 d28 dEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

Last piece of work from my defects has been done - was confusion over which trade should have done the work.
and found that my bathroom window scrapes on the fly…

2 months2 monthsEntilzhaEntilzha posted:
New Home Questions

best thing is to take the measurements on the plans and then allow an extra 1-2cm for variation and then get a final accurate measure once its been constructed. and…

2 months2 monthsEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

that garage door looks good. what colour /style iwill your driveway be?
only a couple of weeks to go now isnt it

2 months2 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

still have 1 item outstanding from my handover/defects list. holes in kitchen cupboards where water pipes enter still waiting to be sealed. no response from builder to last 2 emails…

3 months3 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

well down to last 2 things on my repair list and had a good talk to the carpenter/maintenance guy who came round this morning and got advise on best way…

  ⋅  1
3 months3 monthsEntilzhaEntilzha posted:
1st home build Clearview SA with Hickinbotham

impressive splashback, bet the tiler was happy when it was done. those black floor tiles where they standard range or a premium range
i picked a cloudy black tile and grey…

3 months3 monthsEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

wont be too long and you will get to see your kitchen and tiles areas done. i think thats is a great feeling as you see the inside come together…

  ⋅  1
3 months3 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

was very quick response and electrician was here by 12. only took 10 minutes - was a faulty wall socket. but they did another minor piece of remediation (cleaning up…

  ⋅  1
3 months3 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

well builder has rectified some of my defects so far but a few from handover still remain - apparently their kitchen supplier and also tiler will be in touch .…

Hickinbotham Torquay Mod - Post Handover
4 months4 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

Sent of my defect list today - was sent nearly 2 weeks late but they where aware and had advised no problems
I kept delaying it looking for more issues as…

4 months4 monthsEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

those bricks look good.

4 months4 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

well nothing eventuated about looking into the damage as expected. could not pin it down to anyone so i get to wear it. Will get it fixed when i'm doing…

4 months4 monthsEntilzhaEntilzha posted:
First home build SA Hickinbotham- keys 26/2

Hope you get it sorted.

5 months5 monthsEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

looks good. you will have walls up before you know it

  ⋅  1
5 months5 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

I have made a habit to take pictures of every little thing.

5 months5 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

yep - meant to put up a picture

there is actually a footpath under this and you can see the ground compressed where whatever it is was unloaded/driven down the footpath
It…

5 months5 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

Someone recently decided to take a spin down my footpath using a caterpillar track vehicle. starts site next door and goes past me and another house then onto vacant land.…

6 months6 monthsEntilzhaEntilzha posted:
Hickinbotham Torquay Mod - Post Handover

all resolved re my window sills. the one that looks flat and i was advised might need remediation work is actually correct angle but only protrudes half the standard distance…

6 months6 monthsEntilzhaEntilzha posted:
ADH - custom KDR in Clearview. Countdown to handover!!

looks good. once the roof is on and its wrapped its a lot easier to see the amount of light your windows will give as well.

6 months6 monthsEntilzhaEntilzha posted:
Passive shading NW Facing glass doors

Thanks. ill look at as many options as i can - plenty of time before next summer - will see how it goes through winter first to get a feel…

More
Joined homeone
12 March 2017

Australia's largest home building and renovation
community with over 1.7 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2018

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on TwitterFollow homeone on Google+
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2018