Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Gibson
500 Posts
Gibson
500 Posts
Gold Member

Follow
500Posts3LikesMost Active Topics

Gibson

Joined 30 October 2014
Gold Member
Followers
2 h2 hGibsonGibson posted:
Masterton Homes - The next thread 4.0

Hi Buildinsydney,
M require the site to be clear of all building materials, vegetation and grass. They want a bare patch of dirt to work on.
Part of the DA for…

13 d13 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Buildinsydney, it's just the luck of the draw and a lot is due to the competence of the Site Supervisor you get.
Our first SS was good but had too…

14 d14 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Hang in there!
This is the state of our house on the day the build was contracted for completion.
M completed the house 7 months late.

14 d14 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Don't be rushed by PCI, it's your big opportunity to call out any problems with the house. Once PCI is completed M have 2 weeks to fix the defects then…

15 d15 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Welcome to the journey
Which Duplex are you building?

15 d15 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

You generally won't get the OC from your council until landscaping etc has been completed, which for most of us is well after handover.
Our bank paid the final invoice…

15 d15 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Any 'upgrade' quote already allows for deleting the standard inclusions.
It pays to shop around for flooring.

15 d15 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Buildinsydney, I would get M to install all of your light points & power points. There is a maximum load for each circuit so if you get another sparky to…

19 d19 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Buildinsydney , you could investigate a multi-room split system, but I don't see the advantage over a ducted system.
In split system every room needs a head unit mounted on…

20 d20 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Hi Buildinsydney,
We went with Actron www.actronair.com.au, they manufacture in Australia and have a good range.
5 - 6 zones is quite a lot. We upgraded to…

27 d27 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Our build ran 6 months late, I wrote to David M at Warwick Farm via good old snail mail.
No response from him but I'll PM you some contact info…

27 d27 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Hi buildinsydney,
We were hit with additional costs for rock excavation and clean fill. There's an adage in building that you never really know your costs until you are out of…

30 d30 dGibsonGibson posted:
Masterton Homes - The next thread 4.0

Supercharged Synergy, they do look like 2 great designs.
We spent ages touring the display villages looking for a design we liked that would fit on our block.
Good luck…

1 month1 monthGibsonGibson posted:
Masterton Homes - The next thread 4.0

Congrats beeprelude

1 month1 monthGibsonGibson posted:
Masterton Homes - The next thread 4.0

Hi Saltwater,
We occasionally had Tradies on Saturdays. As they are all subbies it's up to them when they work . So if you get someone keen for the extra cash/…

2 months2 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

Looking good beeprelude.
Kly525, good luck on your build. My advice is never wait for the SS to get in touch - reach out to him when ever you need…

2 months2 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

The only things that should be outstanding are appliances and minor fixes. Anything major - like your missing roof need to be completed prior to Handover.
Once you have made your…

2 months2 monthsGibsonGibson posted:
Who's building with Clarendon??

JK27, we are building with Masterton and they quote the floor height the same way.
I argued the point when we signed the contract , the guy laughed and said…

2 months2 monthsGibsonGibson posted:
Initial Builders Meetings - Why so secret? (1st timer)

Our builder has a margin of 27%.
With some upgrades you are better off doing them yourself after handover. It's not hard to change taps as long as they are the…

2 months2 monthsGibsonGibson posted:
Building again, Ben Trager homes WA

Tinkster, building for a 3rd time. You are brave!
Best of luck.

2 months2 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

Hi pommie,
That's quite a big decision, i hope you find another builder that you can put your faith in.
Had we known our build was going to take 2 years…

2 months2 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

Just when I thought the stress was behind me... now I'm dealing with a landscaper who wants to increase his price by $12K for a 6 meter retaining wall and…

2 months2 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

Pommie, the final tender should be enough for your loan.
If you need to, get M to increase your provisions in the tender for things like additional fill/spoil removal, storm…

2 months2 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

Hi Pommie,
We sat there and read through the contract before signing it. It comes in 2 parts, there is a standard building contract and then M's variations. Pay attention to…

2 months2 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

We did a walkthrough with the SS and then emailed him with the list of items we wanted fixed.

3 months3 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

I think our inspection cost around $600. We had it done just prior to PCI. We spoke to our Inspector about doing one earlier but he said that M are…

  ⋅  1
3 months3 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

We escalated our complaints to David Masterton , they made little difference to the speed of the remaining work.
I'll PM you done contact details for the Customer Service Manager.…

3 months3 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

Well folks I think we've made it.
Deposit paid in Nov 2015.
The old house was demolished in Feb 2016. Site handover in March.
Foundation piles poured in May 2016
...…

  ⋅  1
3 months3 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

MartinsHarmony, your home looks fantastic.

3 months3 monthsGibsonGibson posted:
Masterton Homes - The next thread 4.0

Our appliances installation started on 15th August, the rangehood was installed on Thursday.
Just the garage door motor to go and we are done!!!

Most Active Topics

More
Joined homeone
30 October 2014

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on TwitterFollow homeone on Google+
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2017