Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
gopalc
52 Posts
MessageFollow
gopalc
52 Posts
Loyal Member

Follow
52PostsMost Active Topics

gopalc

Joined 17 May 2016
Loyal Member
Followers
3 d3 dgopalcgopalc posted:
Arden Developments

We chose 600X600 polished porcelain for floor ( Bora Marfil) and Mosaic hex stones, for splash back. Hope it will come good. I will share photos once its installed. Tiles…

7 d7 dgopalcgopalc posted:
Arden Developments

I tried that with PTF and they wouldnt discuss any thing related with Order, Keep telling me to contact Arden. Arden response was its too late as we are in…

7 d7 dgopalcgopalc posted:
Arden Developments

PTF website says both floating and glue down options for engineered floors. May be you are getting floors where glue down is only option. Our is Tasmaian oak which can…

7 d7 dgopalcgopalc posted:
Arden Developments

Exactly my point.... default option is cheaper and glue will cost little bit more i imagine but when i have upgraded the floor boards to category 8 then atleast i…

7 d7 dgopalcgopalc posted:
Arden Developments

Ya, even we are nervous about it. Have you got engineered floor boards? if yes, have you selection option of install with direct glue method rather than just floating boards…

7 d7 dgopalcgopalc posted:
Arden Developments

We are also building Toulouse 49 with Noosa facade. Which one you are going with. Where are you building ? tks

  ⋅  1
9 d9 dgopalcgopalc posted:
Arden Developments

Regarding pendant noggin,There will be timber joist at every 450mm , hence there is not need for noggins. Also for TV you will not need noggin as there is stud…

  ⋅  1
17 d17 dgopalcgopalc posted:
Arden Developments

You are correct, Scyon are bit thicker that cedar which is show in display but upper part of Noosa is also thick gray scyon, and hence this should blend into…

17 d17 dgopalcgopalc posted:
Arden Developments

Same dilemma we were on the colour selection day. we have selected timber look weathertex (sycon) instead of default cedar option and home it will come all good. My carpenter…

17 d17 dgopalcgopalc posted:
Arden Developments

No, There isnt any software they use, which is really disappointing. Many of my friends have got their 3D layouts provided in their selected colours to show how is going…

  ⋅  1
17 d17 dgopalcgopalc posted:
Arden Developments

The door along with two sidelights ,which are translucent was 3100. The door height is 2340 as our celling is 2720.
Our facade is Noosa , which has timber looks and…

  ⋅  2
18 d18 dgopalcgopalc posted:
Arden Developments

I think it was 576 for three square lights which are there in bespoke

  ⋅  1
19 d19 dgopalcgopalc posted:
Arden Developments

Its Toulouse with Noosa facade , though we have taken many aspects of bespoke in our design

19 d19 dgopalcgopalc posted:
Arden Developments

hob was 2995

19 d19 dgopalcgopalc posted:
Arden Developments

Write reply...
Hi All, here is the photo of our stairs and door. At the moment , there is protective ply over the hardwood and its not stained yet. Once flooring…

  ⋅  2
27 d27 dgopalcgopalc posted:
Arden Developments

Yes , we got gas cooktop, sink and dishwasher in butlers as well

27 d27 dgopalcgopalc posted:
Arden Developments

It costed me $4081 to upgrade to cat4 stone but ours was big butler pantry also included with extended island and waterfall edges

28 d28 dgopalcgopalc posted:
Arden Developments

Write
reply...
we had neutral splash back. our walls stowe white . Your is cool colours with Grey theme, hence you need to choose dark grey to give break to white…

  ⋅  1
28 d28 dgopalcgopalc posted:
Arden Developments

Noticed that prices have gone up for new arden home wef june. 2K up for Toulouse.

29 d29 dgopalcgopalc posted:
Arden Developments

No, Sorry, I mean, you will get blank copy of HIA contract 21 days before your contract day. Then , week ( or couple of days)…

29 d29 dgopalcgopalc posted:
Arden Developments

No , we didn't get contract verified. Its a standard HIA document which they need to share 21 days before you signing it. The only things they would fill would…

  ⋅  1
29 d29 dgopalcgopalc posted:
Arden Developments

Hob is a based platform made out of wood, which from floor level become first step and from this platform , stairs will start as second step.

29 d29 dgopalcgopalc posted:
Arden Developments

Thanks so much for your response. i know much better now on process and time. Ours will start next week.

29 d29 dgopalcgopalc posted:
Arden Developments

we also went with NHI. Please request for Kevin if possible with lot of prior notice.

30 d30 dgopalcgopalc posted:
Arden Developments

Great colour choice, that will look excellent. If you have a hob at first step, make sure it is reflected in the building plans, else they tend to forget it…

30 d30 dgopalcgopalc posted:
Arden Developments

ok, great , have you got glass or steel balustrades ? we have steel ones. The important thing to notice is the stain it with colour which matches with your…

30 d30 dgopalcgopalc posted:
Arden Developments

Thanks for sharing photos of Hebel rendering and stairs, looks great. How much time it took to install hebel and rendering?
Our is still waiting on first floor install and then…

Most Active Topics

Arden Developments
712 Posts
Joined homeone
17 May 2016

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy
Professionals
Advertise
Contact Us

Follow homeone on FacebookFollow homeone on TwitterFollow homeone on Google+
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2017