8 years8 yearsmirageq1 posted:
Building Metricon Glendale 42 Limited Edition in Geelong
Building Metricon Glendale 42 Limited Edition in Geelong
How many days was your build going to take on contract?
8 years8 yearsmirageq1 posted:
colorbond loft render
colorbond loft render
How did you manage to get a colorbond colour as a render colour?
8 years8 yearsmirageq1 posted:
Building Metricon Glendale 42 Limited Edition in Geelong
Building Metricon Glendale 42 Limited Edition in Geelong
Not a problem. I have 4 articulation joints on the corners that join my two front piers. (With Plantation Homes in QLD)
8 years8 yearsmirageq1 posted:
Building Metricon Glendale 42 Limited Edition in Geelong
Building Metricon Glendale 42 Limited Edition in Geelong
Those are articulation joints. Should be on your plans.
They will fill it up with some sort of sealant
8 years8 yearsmirageq1 posted:
Framing Stage
Framing Stage
Hey Anthony
Are you at Arbour Reach?
Plantation homes has been fairly smooth during administration although it was very long and boring. There had been some problems during this stage however…
8 years8 yearsmirageq1 posted:
Framing Stage
Framing Stage
im building the mirage q1 with ph in qld. I have included a cut down storage door in the garage but theres no space in the frames to accomodate this…