Fixing decorative mouldings to solid brick walls
Foam spray adhesive, low expansion
Not the one which fills big holes
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Builder Terminated contract after Variation Requested
Ok, how about section on terminating contract
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Builder Terminated contract after Variation Requested
Could you post clause 13
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Questions re: Practical Completion
Read your contract
Very important to understand what have to do when builder issues final payment invoice. That is the critical moment and prepare for it
PCI is important, often…
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Need a professionals for rendering
What is it going on?
Have you chosen a colour ?
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
HIA Contract
Fair for builder to charge to review a report provided by party not involved with build
What is written in contract
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Concerning charges from builder for building inspector
Fair and reasonable cost.
Asking builder to evaluate a report provided by a third party.
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Are these windows gaps and uneven brick finishing acceptable
Please read contract about defects and incomplete work so aware of procedure
If don’t contest, you have accepted work
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Fixing damaged 3 coat acrylic render
Maybe removal of mortar, meshing, new exe, grinding render off
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Fixing damaged 3 coat acrylic render
Best way is to repair (remove damaged render/treat), patch then re-texture entire wall corner to corner
Then paint
Paint is for colour not too cover things
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Creaking Hebel Floor and repairs
Hebel 75mm floor:
The glue added will do nothing, will not miraculously stick panel together.
Often the panels get cracks in them from handling and if a joist is higher/lower.
Would…
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Mortar Color
Will need to find multiple suppliers of sand and mix up samples
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Are these windows gaps and uneven brick finishing acceptable
Only way to fix is to pull apart and redo, even then may end up with mortar bit different colour
Have more rights now during build than after handover , read…
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Rain damaged concrete causing dusting
Want rough surface for ‘rende/leveller’’ to grip, best
Get scope of works, original concreter has opportunity to remedy
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Designing, Building & Developing a Luxury home in Lindfield
Hi, how are building costs going? Down /up
Builders pocketing extra now or owners getting small decrease
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Final Invoice and Key Handover
Hi
Need to read your contract about when final payment is received. Clearly outlines what happens.
In vic, known defects or incomplete work must be completed before final payment. Builder can…
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
insulation/filler for gaps in window frames
Frame opening (head)is too big, error
Also need timber to fix architrave/plaster
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
What is an allowable amount of movement?
Ok be good to see how all goes
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Seeking Recommendations for Inspection Services in Wodonga
Please read your contract regarding handover process.
Generally, once final payment invoice is issued you have 7 days to meet builder on site and present a list of defects…
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
What is an allowable amount of movement?
How will you determine if tree roots causing problem
![Pedro4137](https://www.homeone.com.au/img/avatar_h1_dev_small.png)
Defects/Items found after final inspection
The significant date is when receive final payment invoice
Check that section of contract
Bit of fluff by builders prior to that