Home
Pros
Forum
  • About
  • Register
  • Contact
InboxSent
MembersPros
WatchingStarredHistory
Pedro4137
169 Posts
Pedro4137
169 Posts
Bronze Member

Follow
169Posts8LikesMost Active Topics

Pedro4137

Joined 19 August 2021
Bronze Member
Followers
12 h12 hPedro4137Pedro4137 posted:
Fixing decorative mouldings to solid brick walls

Foam spray adhesive, low expansion
Not the one which fills big holes

10 d10 dPedro4137Pedro4137 posted:
Builder Terminated contract after Variation Requested

Ok, how about section on terminating contract

11 d11 dPedro4137Pedro4137 posted:
Cheminees Philippe

Have a picture

12 d12 dPedro4137Pedro4137 posted:
Steel vs timber frame

Good summary Simeon

16 d16 dPedro4137Pedro4137 posted:
Questions re: Practical Completion

Read your contract
Very important to understand what have to do when builder issues final payment invoice. That is the critical moment and prepare for it
PCI is important, often…

18 d18 dPedro4137Pedro4137 posted:
Need a professionals for rendering

What is it going on?
Have you chosen a colour ?

22 d22 dPedro4137Pedro4137 posted:
Metricon

Can’t be too hard for supervisor to send of PO can it?
Ask trade if job finished

25 d25 dPedro4137Pedro4137 posted:
HIA Contract

Me too

25 d25 dPedro4137Pedro4137 posted:
HIA Contract

Fair for builder to charge to review a report provided by party not involved with build
What is written in contract

1 month1 monthPedro4137Pedro4137 posted:
Concerning charges from builder for building inspector

Fair and reasonable cost.
Asking builder to evaluate a report provided by a third party.

1 month1 monthPedro4137Pedro4137 posted:
Are these windows gaps and uneven brick finishing acceptable

Please read contract about defects and incomplete work so aware of procedure
If don’t contest, you have accepted work

1 month1 monthPedro4137Pedro4137 posted:
Fixing damaged 3 coat acrylic render

Any material left from build

1 month1 monthPedro4137Pedro4137 posted:
Fixing damaged 3 coat acrylic render

Maybe removal of mortar, meshing, new exe, grinding render off

1 month1 monthPedro4137Pedro4137 posted:
Fixing damaged 3 coat acrylic render

Best way is to repair (remove damaged render/treat), patch then re-texture entire wall corner to corner
Then paint
Paint is for colour not too cover things

1 month1 monthPedro4137Pedro4137 posted:
Creaking Hebel Floor and repairs

Hebel 75mm floor:
The glue added will do nothing, will not miraculously stick panel together.
Often the panels get cracks in them from handling and if a joist is higher/lower.
Would…

2 months2 monthsPedro4137Pedro4137 posted:
Mortar Color

Will need to find multiple suppliers of sand and mix up samples

2 months2 monthsPedro4137Pedro4137 posted:
Sourcing cheaper priced paint?

Do you know how much paint need

2 months2 monthsPedro4137Pedro4137 posted:
Are these windows gaps and uneven brick finishing acceptable

Only way to fix is to pull apart and redo, even then may end up with mortar bit different colour
Have more rights now during build than after handover , read…

2 months2 monthsPedro4137Pedro4137 posted:
Rain damaged concrete causing dusting

Want rough surface for ‘rende/leveller’’ to grip, best
Get scope of works, original concreter has opportunity to remedy

2 months2 monthsPedro4137Pedro4137 posted:
Designing, Building & Developing a Luxury home in Lindfield

Hi, how are building costs going? Down /up
Builders pocketing extra now or owners getting small decrease

2 months2 monthsPedro4137Pedro4137 posted:
Asking for Render colours suggestions

Are you painting the render?

3 months3 monthsPedro4137Pedro4137 posted:
Final Invoice and Key Handover

Hi
Need to read your contract about when final payment is received. Clearly outlines what happens.
In vic, known defects or incomplete work must be completed before final payment. Builder can…

  ⋅  1
3 months3 monthsPedro4137Pedro4137 posted:
insulation/filler for gaps in window frames

Frame opening (head)is too big, error
Also need timber to fix architrave/plaster

3 months3 monthsPedro4137Pedro4137 posted:
What is an allowable amount of movement?

Ok be good to see how all goes

3 months3 monthsPedro4137Pedro4137 posted:
Seeking Recommendations for Inspection Services in Wodonga

Please read your contract regarding handover process.
Generally, once final payment invoice is issued you have 7 days to meet builder on site and present a list of defects…

3 months3 monthsPedro4137Pedro4137 posted:
What is an allowable amount of movement?

How will you determine if tree roots causing problem

4 months4 monthsPedro4137Pedro4137 posted:
Defects/Items found after final inspection

The significant date is when receive final payment invoice
Check that section of contract
Bit of fluff by builders prior to that

Joined homeone
19 August 2021

Australia's largest home building and renovation
community with over 1.8 million posts

Home
Pros
Forum
Start a new topic
About
Advertise
Contact Homeone
Articles
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024

Australia's largest home building and
renovation community
Homeone
About

Terms
Privacy

Follow homeone on FacebookFollow homeone on Twitter
All comments made express the views and opinions of the author and not the Administrators, Support nor Homeone Australia & New Zealand
© Homeone Australia & New Zealand All Rights Reserved ‎2001 - 2024