Provisional Sum
Can my builder claim an additional amount for a provisional sum at the final payment?
The situation is that at the start of the build in may 2021 not enough…
Ground level at handover
Thanks SaveH2O! I truly appreciate your response to this post, your knowledge is very helpful!
Unfortunately, we didn’t engage with a private building inspector until the end. We naively trusted our…
Damp proof course
Hi building-expert,
I have been searching posts for a few days regarding ground levels, thankfully I have found this post!
I’m having a similar issue. Is there a specific requirement regarding the…
Ground level at handover
Thanks for your reply Callifo ☺️
At this stage the soil is flat around the perimeter of the house with no slope away. We have had a fair amount of rain…
Stormwater and tank water pipes
Thanks SaveH20!
I will have a look to see what I can find 😃
Currently, in some sections the pipes are 50mm below the surface. Our independent building inspector and builder…
Stormwater and tank water pipes
Could someone tell me the Australian Standard for the depth of stormwater pipes and tank water pipes around the house?
Is there someone who could inspect the site to certify…
Ground level at handover
How is a builder required to leave the ground level around the house? Specifically, the 1m perimeter from the slab?
As per the DA plans we will be laying turf, should…
Invoices and receipts from builder
Hi,
Upon request do builders need to supply/provide invoices and/or receipts for works completed in NSW?
If so, what are the timeframes for this and what detail is expected in the invoice…